BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of replacement of existing bituminous pavement with concrete pavement, replacement of curb and gutter, and ADA pedestrian ramps along Channel Parkway in Marshall, MN. The Engineer's Estimate for Project ST-008 is $3,123,898.75. The cost to submit a bid is $25 plus a 3rd party payment processing fee. Questions regarding this Project, including any questions prior to bidding, shall be directed to Jason Anderson, Director of Public Works, at (507) 537-6773 or Jason.Anderson@ci.marshall.mn.us.

Award

Roads / Highways

$1,374,152.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
27
Bidding Soon
394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

May 8, 2023

Project location map

Multiple Locations, Marshall, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.