Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Aspen, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Contractor shall meet the following construction timeline: • Construction in the City of Aspen right-of-way is not permitted before April 03, 2023 • Milling may not begin at S. Aspen St from E. Cooper Ave to E. Durant Ave. or at E. Hopkins St. from S. Monarch to S. Mill St. before May 01, 2023 • Milling may not begin at Ute Ave. before May 15, 2023 • Asphalt paving completion of S. Aspen St, S. Monarch St, 200 block of E. Hyman Ave, E. Hopkins Ave, and Mill St. sections – May 26, 2023 • Asphalt paving completion of N. Aspen St, W. Bleeker Ave. 900 and 1000 blocks of E. Hyman Ave, and Ute Ave. sections – June 16, 2023 • Final repairs, cleanup, and paint striping completion – June 23, 2023. Addendum: 2 As of 9/21/2022 there are two (2) Addenda available for this project. Asphalt street improvements to improve structural stability and provide increased longevity on up to 10 street segments. Full width roto-milling will remove 1.5-inches of asphalt thickness, sub-base repair work may be completed where necessary, and a new 2.0-inch asphalt mat will be placed to bring the street to grade. The street segments are included in the following table: STREET FROM:TO W. Bleeker St. N. 6th To N. 7th E. Hopkins St. S. Monarch St. To S. Mill St. E. Hyman Ave. S. West End St. To end of Hyman (900 and 1000 block of E. Hyman) E. Hyman Ave. S. Aspen St. To S. Monarch St (200 block of E. Hyman) N. Aspen St. E. Main St. To E. Bleeker St. N. Mill St. E. Main St. To Rio Grande Pl. N. Mill St. Rio Grande Pl. To the speed hump past Gibson Ave. S. Aspen St. E. Main St. To E. Durant Ave. S. Monarch St. E. Hyman St. To E. Durant Ave. Ute Ave. S. Original St. To End of Ajax Park Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Job Location Aspen Colorado Question Acceptance Deadline 09/17/2022 01:59 AM EDT Questions are submitted online Yes
Award
Roads / Highways
$854,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2022
April 3, 2023
Multiple Locations, Aspen, CO
Related To This Project
Aspen, CO
Bid Date: Aug 23 2016
Aspen, CO
Bid Date: Dec 06 2022
Aspen, CO
--
Aspen, CO
--
Aspen, CO
--
Aspen, CO
--
Aspen, CO
Bid Date: Jan 20 2023
Aspen, CO
Bid Date: Sep 23 2022
Aspen, CO
Bid Date: Oct 11 2022
Aspen, CO
Bid Date: Nov 10 2022
Aspen, CO
Bid Date: Feb 28 2020
Aspen, CO
Bid Date: Oct 22 2021
Aspen, CO
Bid Date: Oct 20 2022
Edwards, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.