BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Aspen, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contractor shall meet the following construction timeline: • Construction in the City of Aspen right-of-way is not permitted before April 03, 2023 • Milling may not begin at S. Aspen St from E. Cooper Ave to E. Durant Ave. or at E. Hopkins St. from S. Monarch to S. Mill St. before May 01, 2023 • Milling may not begin at Ute Ave. before May 15, 2023 • Asphalt paving completion of S. Aspen St, S. Monarch St, 200 block of E. Hyman Ave, E. Hopkins Ave, and Mill St. sections – May 26, 2023 • Asphalt paving completion of N. Aspen St, W. Bleeker Ave. 900 and 1000 blocks of E. Hyman Ave, and Ute Ave. sections – June 16, 2023 • Final repairs, cleanup, and paint striping completion – June 23, 2023. Addendum: 2 As of 9/21/2022 there are two (2) Addenda available for this project. Asphalt street improvements to improve structural stability and provide increased longevity on up to 10 street segments. Full width roto-milling will remove 1.5-inches of asphalt thickness, sub-base repair work may be completed where necessary, and a new 2.0-inch asphalt mat will be placed to bring the street to grade. The street segments are included in the following table: STREET FROM:TO W. Bleeker St. N. 6th To N. 7th E. Hopkins St. S. Monarch St. To S. Mill St. E. Hyman Ave. S. West End St. To end of Hyman (900 and 1000 block of E. Hyman) E. Hyman Ave. S. Aspen St. To S. Monarch St (200 block of E. Hyman) N. Aspen St. E. Main St. To E. Bleeker St. N. Mill St. E. Main St. To Rio Grande Pl. N. Mill St. Rio Grande Pl. To the speed hump past Gibson Ave. S. Aspen St. E. Main St. To E. Durant Ave. S. Monarch St. E. Hyman St. To E. Durant Ave. Ute Ave. S. Original St. To End of Ajax Park Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Job Location Aspen Colorado Question Acceptance Deadline 09/17/2022 01:59 AM EDT Questions are submitted online Yes

Award

Roads / Highways

$854,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
7
Bidding Soon
122
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2022

April 3, 2023

img_map_placeholder

Multiple Locations, Aspen, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.