EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Rocklin, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Contractor shall provide all materials, equipment, and labor necessary to install two (2) ADA paths of travel from the parking garage to the pool and North of the existing tennis courts. Questions Due Date: Aug 30th 2022, 2:00 PM PDT Description of Work: This project consists of the installation of (2) new ADA paths of travel. One from the existing parking garage to the existing pool and the other north of the existing tennis courts located at Sierra Joint Community College District, Rocklin Campus (District). Bid Bond - A bid guarantee in the amount of 10% of the bid must accompany the bid. Bid Security can be provided in the form of certified or cashiers check or bid bond in the amount of not less than ten percent (10%) of the total bid price. Failure to furnish bid guarantee in the proper form and amount, by the time set for opening the bids, may be cause for rejection of the bid. Payment & Performance Bonds: The contractor awarded the project will be required to provide a 100% payment bond and 100% performance bond BEFORE work can begin. Prevailing Wage Laws: This project is subject to prevailing wage provisions of the Labor Code Article 2. No contractor or subcontractor may be listed on a bid for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 Should the work contracted for under this agreement not be completed within the contract period plus, if any, authorized extension of time, there will be deducted from any money due or that may become due the Contractor under the contract the sum of $500.00 per day as liquidated damages and not as a penalty, for each calendar day delay after the expiration of said time until the substantial completion of said work. Substantial Completion shall be achieved when the work shown in the construction documents is complete and the stadium lighting is operational. Substantial Completion shall be achieved within 37 calendar days after issuance of Notice to Proceed. Substantial completion of work must be achieved by November 18, 2022.

Award

Sidewalks / Parking Lot

$55,429.00

Public - County

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Aggregate Surfacing, Crushed Stone Surfacing, Curbs and Gutters, Site Improvements, Retaining Walls, Segmental Retaining Walls, Gabion Retaining Walls, Planting, Planting Preparation, Soil Preparation, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Assembly and Testing Equipment

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
82
Bidding Soon
1,423
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

October 3, 2022

img_map_placeholder

5100 Sierra College Blvd, Rocklin, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sierra Community College Accessible Route Additions

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.