EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 9, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Northern Cambria, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

As of December 9, 2022. Project was awarded to the FF: Contract 2022-1 General Construction = Lobar, Inc. $9,586,000 Contract 2022-2 HVAC = Marc Services, Inc. $465,855.00 Contract 2022-3 Plumbing = K&K Plumbing Co, Inc. $198,387.00 Contract 2022-4 Electrical = Bettwy Electric, Inc. $1,037,000 Project includes the following Work: construction of a new water treatment facility and ancillary structures and facilities including, but not limited to, a pump station; emergency generator, backwash equalization tank; waste neutralization tank; associated site , and piping; and all other Work indicated in the Contract Documents. The water treatment facility will include of dual train microfiltration (MF) membrane systems, dual train reverse osmosis (RO) filtration systems, a disinfection clearwell, chemical storage room and feed systems, chemical cleaning systems for the MF and , finished water pumping facility, electrical and controls room, laboratory, office, and associated HVAC, plumbing, process piping, and process monitoring / instrumentation. The raw water pump station will be to the source intake structure to receive raw water and pump to the proposed treatment facility.are requested for the following Contracts: 2022-1: General Construction Work, 2022-2: HVAC Work, Work & 2022-4: Electrical Work bids will not be accepted. Certified check or bank draft, payable to the order of the Owner or negotiable U.S. Government Bonds (at par value), satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies on the Treasury Departments most current list (Circular 570 as amended) and be authorized to transact the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with to guarantee the Bidders entrance into a contract if given the award. No bid bond shall be waived or the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications or statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in of one hundred percent (100%) of the Contract Price on the forms provided, with a surety company listed on Department's most current list (Circular 570 as amended) and be authorized to transact business in the State . Bacon wage rates will apply to this contract. The contract documents contain requirements addressing wage rates, labor standards, nondiscrimination in hiring practices and related matters. contractors and subcontractors shall comply with the Public Works Employment Verifications Act. The Act contractor to verify employment eligibility through the e-verify program operated by the United States Department Security as a precondition of being awarded a contract for this project. The contract documents and verification Form regarding the Act. Contractors the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any in the areas of project construction, equipment, services, and supplies by including state qualified , and minority and women owned business enterprises in the bidding process. Steel Products Procurement Actand American Iron and Steel apply to this project for all steel used . Owner shall award the contract to the lowest responsible bidder or shall reject all bids within 60 days of date bid opening, and no bidder may withdraw his bid before the expiration of such 60-day period; PROVIDED, if the award of the contract is delayed by a required approval of another government agency, the sale of bonds award of the grant or grants, the Owner shall reject all bids or award the contract to the lowest responsible 120 days of the date of the BID opening, and no bidder may withdraw his bid before the expiration of such 120-. Thirty (30) day extensions of the date for the award of the contract may be made by the mutual written consent Owner and the lowest responsible bidder. General/Mechanical - Lobar Inc. - $9,586,000.00 HVAC - Marc Services Inc - $465,855.00

Award

Water / Sewer

$11,287,229.00

Public - City

Renovation

134

40

13

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Slotted Channel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Metal Roof Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells, Other Equipment, Horticultural Equipment, Seeders
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
49
Bidding Soon
799
All Active Projects
379
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

November 18, 2022

img_map_placeholder

602 Old Miller Rd, Northern Cambria, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Miller Hollow Water Treatment Facility & Source Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.