BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Anderson, South Carolina. Contact the soliciting agency for additional information.

The City of Anderson, South Carolina is requesting qualifications from professional and experienced consultants to develop a Comprehensive Plan for the City in accordance with the preliminary scope of work and expectations outlined in the RFQ. The Comprehensive Plan will be forward thinking and address anticipated growth in a way that ensures Anderson is the most desirable city in the region. Anderson is located in the Upstate region of South Carolina at the midpoint along the Interstate 85 corridor between Charlotte, NC and Atlanta, GA. With its growing population (28,000 and rising), the City of Anderson is dedicated to addressing rapid growth patterns by developing strategic plans that reflect a vision set forth by the community. Significant City projects that currently shape progress include a new downtown master plan, expansion of the recreation center and sports facilities, new and expanded parks, a joint city/county wayfinding plan, a downtown parking study, and a new shared kitchen incubator for food entrepreneurs. Significant private sector projects include a new Hilton hotel downtown, a substantial rise in the construction of new housing developments, and continuous commercial growth along Anderson's major corridors and the downtown district. The Comprehensive Plan process will include the inventory, analysis, and synthesis of information and recommendations with a strong emphasis on land use planning, infrastructure, economic and community development, recreation, and housing. The selected consultant(s), with direction from the City, will engage the community in a participatory process; facilitate public meetings; prepare the proposed plan for review by the City; and, based on this collective information and input, finalize the updated Comprehensive Plan. The Plan will be adopted by the City Council and Planning Commission and will be used as a guide for local development, policies, and capital improvement projects that define the quality of life in Anderson. The selected consultant will be responsible for the Comprehensive Plan process and scope of work included but not limited to the following items: 1. Develop a timeline for the completion of the Comprehensive Plan with clear deadlines and specific action items identified for each phase of the project. 2. Inventory of existing conditions. 3. A statement of needs and goals. 4. Establish and implement a community outreach strategy to ensure appropriate resident, business, and City staff involvement is present throughout the planning process. The public outreach efforts will help to establish and prioritize goals and strategies to meet the community's vision. 5. Evaluate the existing Comprehensive Plan and other City plans, studies, and reports that support development and strategic growth. Examples of existing plans and policies include: o 2021 Wayfinding Plan o 2019 Downtown Master plan branded "Shock This Block" o 2019 Downtown Parking Study o 2017 Parks and Recreation Master Plan o 2014 Bike-Pedestrian Connectivity Plan 6. Prepare for and present at workshops for citizens, property owners, and stakeholders; conduct workshops and visioning sessions with residents, business owners, and City staff; and present formally to the City Council and Planning Commission for public input, plan consideration, and final adoption. 7. Hold meetings and calls with City staff (a steering committee) to provide updates on progress and solicit input. 8. Research and analyze existing land use patterns, development patterns and projects, environmental constraints, and regulatory codes to establish existing conditions as well as identify major issues and opportunities. Data should be used to prepare estimates, projections, and forecasts. Analysis should include identification of future growth areas. 9. Formulate and recommend objectives and policies using goals set forth by City Council, direction in other City plans, and results of the participatory process, and data inventory and analysis. 10. Develop implementation strategies with time frames. 11. Prepare an updated Future Land Use Map for city limits. 12. Prepare a Comprehensive Plan that incorporates all existing and new plans. The Plan will include an executive summary to be highly graphic, illustrative, jargon-free, and implementable. The final Comprehensive Plan shall be presented to the City Council and Planning Commission for adoption. 13. The Comprehensive Plan should be developed pursuant to the state enabling legislation, Section 6-29-510 of the South Carolina Code of Laws [also known as the South Carolina Local Government Comprehensive Planning Enabling Act of 1994]. The Plan must include, but not be limited to, the following planning elements: a. Population b. Economic Development c. Natural Resources d. Cultural Resources e. Community Facilities f. Housing g. Land Use h. Transportation i. Priority investment j. Resiliency 14. Deliverables will include: o Summary report of key issues and priorities. o Summary of results from questionnaires or other methods utilized to gather public input. o Executive Summary of the Comprehensive Plan. o All GIS data and maps utilized in the process. o 30 copies of the final Comprehensive Plan. o Electronic version of the final Comprehensive Plan in both Word and PDF format. Submittal Deadline: Friday, October 15 at 5pm One digital copy of the proposal should be submitted to: Mary Haley Thompson Director of Strategic Projects City of Anderson mthompson@cityofandersonsc.com Questions about this RFQ or about the process may be directed to Mary Haley Thompson at mthompson@cityofandersonsc.com. Proposals will be reviewed by staff the week of October 18. Interviews will be scheduled the week of October 25. The Method of Contractor Selection has not been determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
38
Bidding Soon
730
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2022

img_map_placeholder

Multiple Locations, Anderson, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.