Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Anderson, South Carolina. Contact the soliciting agency for additional information.
The City of Anderson, South Carolina is requesting qualifications from professional and experienced consultants to develop a Comprehensive Plan for the City in accordance with the preliminary scope of work and expectations outlined in the RFQ. The Comprehensive Plan will be forward thinking and address anticipated growth in a way that ensures Anderson is the most desirable city in the region. Anderson is located in the Upstate region of South Carolina at the midpoint along the Interstate 85 corridor between Charlotte, NC and Atlanta, GA. With its growing population (28,000 and rising), the City of Anderson is dedicated to addressing rapid growth patterns by developing strategic plans that reflect a vision set forth by the community. Significant City projects that currently shape progress include a new downtown master plan, expansion of the recreation center and sports facilities, new and expanded parks, a joint city/county wayfinding plan, a downtown parking study, and a new shared kitchen incubator for food entrepreneurs. Significant private sector projects include a new Hilton hotel downtown, a substantial rise in the construction of new housing developments, and continuous commercial growth along Anderson's major corridors and the downtown district. The Comprehensive Plan process will include the inventory, analysis, and synthesis of information and recommendations with a strong emphasis on land use planning, infrastructure, economic and community development, recreation, and housing. The selected consultant(s), with direction from the City, will engage the community in a participatory process; facilitate public meetings; prepare the proposed plan for review by the City; and, based on this collective information and input, finalize the updated Comprehensive Plan. The Plan will be adopted by the City Council and Planning Commission and will be used as a guide for local development, policies, and capital improvement projects that define the quality of life in Anderson. The selected consultant will be responsible for the Comprehensive Plan process and scope of work included but not limited to the following items: 1. Develop a timeline for the completion of the Comprehensive Plan with clear deadlines and specific action items identified for each phase of the project. 2. Inventory of existing conditions. 3. A statement of needs and goals. 4. Establish and implement a community outreach strategy to ensure appropriate resident, business, and City staff involvement is present throughout the planning process. The public outreach efforts will help to establish and prioritize goals and strategies to meet the community's vision. 5. Evaluate the existing Comprehensive Plan and other City plans, studies, and reports that support development and strategic growth. Examples of existing plans and policies include: o 2021 Wayfinding Plan o 2019 Downtown Master plan branded "Shock This Block" o 2019 Downtown Parking Study o 2017 Parks and Recreation Master Plan o 2014 Bike-Pedestrian Connectivity Plan 6. Prepare for and present at workshops for citizens, property owners, and stakeholders; conduct workshops and visioning sessions with residents, business owners, and City staff; and present formally to the City Council and Planning Commission for public input, plan consideration, and final adoption. 7. Hold meetings and calls with City staff (a steering committee) to provide updates on progress and solicit input. 8. Research and analyze existing land use patterns, development patterns and projects, environmental constraints, and regulatory codes to establish existing conditions as well as identify major issues and opportunities. Data should be used to prepare estimates, projections, and forecasts. Analysis should include identification of future growth areas. 9. Formulate and recommend objectives and policies using goals set forth by City Council, direction in other City plans, and results of the participatory process, and data inventory and analysis. 10. Develop implementation strategies with time frames. 11. Prepare an updated Future Land Use Map for city limits. 12. Prepare a Comprehensive Plan that incorporates all existing and new plans. The Plan will include an executive summary to be highly graphic, illustrative, jargon-free, and implementable. The final Comprehensive Plan shall be presented to the City Council and Planning Commission for adoption. 13. The Comprehensive Plan should be developed pursuant to the state enabling legislation, Section 6-29-510 of the South Carolina Code of Laws [also known as the South Carolina Local Government Comprehensive Planning Enabling Act of 1994]. The Plan must include, but not be limited to, the following planning elements: a. Population b. Economic Development c. Natural Resources d. Cultural Resources e. Community Facilities f. Housing g. Land Use h. Transportation i. Priority investment j. Resiliency 14. Deliverables will include: o Summary report of key issues and priorities. o Summary of results from questionnaires or other methods utilized to gather public input. o Executive Summary of the Comprehensive Plan. o All GIS data and maps utilized in the process. o 30 copies of the final Comprehensive Plan. o Electronic version of the final Comprehensive Plan in both Word and PDF format. Submittal Deadline: Friday, October 15 at 5pm One digital copy of the proposal should be submitted to: Mary Haley Thompson Director of Strategic Projects City of Anderson mthompson@cityofandersonsc.com Questions about this RFQ or about the process may be directed to Mary Haley Thompson at mthompson@cityofandersonsc.com. Proposals will be reviewed by staff the week of October 18. Interviews will be scheduled the week of October 25. The Method of Contractor Selection has not been determined at this time.
Conceptual
Municipal
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2022
Multiple Locations, Anderson, SC
Related To This Project
Anderson, SC
Bid Date: Aug 29 2022
Anderson, SC
Bid Date: Jul 07 2022
Anderson, SC
Bid Date: Jun 28 2022
Anderson, SC
Bid Date: Sep 09 2022
Anderson, SC
Bid Date: Jun 28 2022
Anderson, SC
Bid Date: Jun 28 2022
Anderson, SC
Bid Date: Sep 08 2022
Anderson, SC
Bid Date: Jun 22 2022
Anderson, SC
Bid Date: Aug 04 2022
Anderson, SC
Bid Date: Jul 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.