Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 23, 2024 at 7:00 PM
Updated October 1, 2024
Site work for a civil project in Brookhaven, Georgia. Completed plans call for site work for a water / sewer project.
The City of Brookhaven is soliciting competitive sealed bids from qualified contractors for a cured-in-place pipe (CIPP) rehabilitation of the corrugated metal pipe (CMP) Low Water Drain (LWD) at Murphey Candler Lake Dam for the Department of Public Works. Work will be done in accordance with the Contract Documents: Agreement, Drawings (100% Construction Plan for: Murphey Candler Lake Park Dam CMP Spillway and Riser Repair, Permit #MS23-00094, dated February 15, 2024), Special Technical Specifications (Specifications for Murphey Candler Dam CIPP Rehabilitation for City of Brookhaven, February 2024), Special Details, City of Brookhaven Standard Details, Georgia Department of Transportations Standard Drawings, Standard Specifications, and Pay Items Index as the standards for the construction and completion of the work required, except as noted or directed by Engineer. Questions Due Date: Nov 1st 2024, 4:00 PM EDT All communications regarding this solicitation must be with the Purchasing Manager, Purina Alexander, purina.alexander@brookhavenga.gov. All questions or requests for clarification must be sent via electronically. Questions received after this date and time may not be answered. The city contracts with the Contractor as an independent contractor to provide all labor, materials, drawings, submittals, equipment, and/or services necessary or incidental to complete the work for Project 24-022: Low Water Drain CIPP Rehabilitation - Murphey Candler Lake Dam ("Project"). The Scope of work is described in further detail in Exhibit B and shall be delivered and installed in good and workman-like fashion, free of defects, and in accordance with industry standards as well as the Contract Documents, and consistent with the Project Schedule, as may change from time to time (hereinafter, the "Work"). The Contractor acknowledges and agrees that the Work includes the provision of all equipment, components, systems, materials, documentation and other services and items required to perform the Work and make it complete, functional and/or operational, notwithstanding the fact that each such service or item may not be expressly mentioned in the Contract Documents. The contractor shall obtain all required permits to perform the Work and shall furnish City with a copy of the same and shall comply with all codes, safety ordinances, local, state, and federal laws, rules, and regulations applicable to the Work. The contractor shall keep the Project site clean and free from debris resulting from Contractor's Work. Approval of submittals or drawings proposed or submitted by Contractor for its Work by City or any person or entity acting on City's behalf are for administrative purposes only and shall not relieve Contractor of its obligations to follow the terms of the Contract Documents. The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specification directed and the terms of this contract including all incidentals as directed by the City of Brookhaven Director of Public Works or his representative. Unless otherwise specified in the Contract Documents, all work shall be completed in accordance with Georgia Department of Transportation Standard Specifications (current edition), by the completion date. The LWD is located near the bottom of the earthen dam in Murphey Candler Lake, and, as such, dewatering of the work area will be required to be maintained for the duration of the work. A CIPP solution has been designed for the LWD and additional downstream CMP segment(s). All erosion & sediment control practices must be installed, inspected on a daily basis, and maintained to prevent the discharge of sediment from the construction area into downstream areas throughout the duration of the project.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 22, 2024
December 16, 2024
To Be Determined, Brookhaven, GA
Related To This Project
Brookhaven, GA
Bid Date: Oct 25 2022
Brookhaven, GA
--
Brookhaven, GA
Bid Date: Sep 08 2022
Brookhaven, GA
--
Brookhaven, GA
Bid Date: Aug 23 2024
Brookhaven, GA
--
East Point, GA
Bid Date: Nov 15 2022
Loganville, GA
Bid Date: Oct 18 2022
Marietta, GA
Bid Date: Oct 18 2022
Jasper, GA
Bid Date: Jan 20 2023
Ringgold, GA
Bid Date: Oct 27 2022
Evans, GA
Bid Date: Sep 29 2022
Hogansville, GA
Bid Date: Oct 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.