Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2022 at 8:00 PM
Updated September 15, 2023
Site work and asbestos abatement for a mixed-use development in Colfax, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.
Ridgeview S.D. 19 will receive sealed bids for Asbestos Abatement for 2022 Flood Restoration at Ridgeview High School and Junior High School, 202 E. Wood Street in Colfax IL 61728. The work is to remove insulation from boiler room from floor up to approximately six feet above the floor, including 90 square feet of boiler insulation, 50 linear feet of asbestoscontaining pipe insulation, 300 inear feet of fiberglass pipe nsulation and 50 fittings, utilizing gross removal methods and remove floor tile and associated mastic (approximately 10,000 square feet) from throughout the basement utilizing rion-friable removal methods, including grinding floor after removal The Date of Commencement is September 26, 2022. The Date of Substantial Completion is October 7, 2022,
Award
Educational
$77,000.00
Public - City
Asbestos Abatement, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2022
September 26, 2022
202 E Wood St, Colfax, IL
Related To This Project
Colfax, IL
Bid Date: Jul 13 2023
Colfax, IL
Bid Date: Jul 18 2023
Colfax, IL
Bid Date: Mar 14 2022
Colfax, IL
Bid Date: Mar 02 2022
Colfax, IL
Bid Date: Dec 20 2023
Colfax, IL
Bid Date: Apr 26 2024
Colfax, IL
Bid Date: Dec 19 2024
Colfax, IL
Bid Date: Mar 07 2025
Colfax, IL
Bid Date: Feb 12 2021
Colfax, IL
Bid Date: Apr 16 2021
Colfax, IL
Bid Date: Feb 19 2021
Colfax, IL
Bid Date: Dec 08 2021
Colfax, IL
Bid Date: Jan 26 2023
Colfax, IL
Bid Date: Jul 19 2022
Colfax, IL
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
