EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 6, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a recreation facility in Pauls Valley, Oklahoma. Completed plans call for the renovation of a recreation facility.

The Owner will construct under the general contractor method and will be accepting a single bid for all Work required. Each Bidder shall submit, with the Proposal, a Bidders Bond as required in Laws of Oklahoma and the Construction Documents. Such Bonds may be in the form of an irrevocable letter of credit, cashiers check or bid bond. Cash is not acceptable. All such bonds shall be made payable to the Owner in an amount no less than five (5%) percent of the largest combination of the Base Proposal and any Alternates. The Contractor may be required to forfeit the Bid Bond, to the Owner, in the event the Contractor fails to execute a Contract or fails to provide the required Bonding and Insurances. Upon the Owners acceptance of bids, a Contract will be executed between the Owner and the approved Bidder. All bonding and insurance will be attached to the executed Contract. Bids may not be withdrawn for a period of thirty (30) calendar days after the date of this Bid Opening. The Owner reserves the right to reject any or all Bids and waive any informality or irregularity in any Bids received. For information concerning any part of the proposed work, contact the Architect: Architects in Partnership, 3220 Marshall Ave., Norman, OK 73072. Telephone: (405) 360-1300. BY: Garvin County Commissioners

Award

Amusement and Recreation

$475,000.00

Public - County

Renovation

13

9

19

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Parking Areas, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Metal Roof Panels, Metal Wall Panels, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
43
Bidding Soon
484
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

November 8, 2022

img_map_placeholder

Chickasaw St, Pauls Valley, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Garvin County Fairgrounds Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.