BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Midvale, Utah. Working plans call for site work for a water / sewer project.

Midvalley Improvement District is soliciting bids for construction to replace the sewer pipeline in Unionwood Drive to eliminate infiltration. This courtesy posting is an advertisement of a procurement opportunity for Midvalley Improvement District, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by Midvalley Improvment District as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. All questions relative to this project prior to the opening of Bids shall be directed to the ENGINEER Jared@JWOEngineering.com. Questions must be received by 5 pm on 9-5-22. The WORK comprises construction to replace the sewer pipeline in Unionwood Drive to eliminate infiltration. The WORK comprises construction to replace the sewer pipeline in Unionwood Drive to eliminate infiltration. Work consists of the removal of existing 8" concrete- lined sewer pipe and replacing with 8" PVC sewer pipe approximately 613 LF, reconnecting 19 service laterals, and modifications of 5 - 4' sewer manholes and associated work including but not limited to all excavation, dewatering, shoring, concrete, backfill, bypass pumping, traffic control, and site restoration necessary to complete the project in accordance with the plans and specifications to eliminate groundwater infiltration to the sewer system. Bids shall be accompanied by a Bid Bond in the amount of 5% of the bidder's price. : The Owner reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards in the interest of the Owner. Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing The WORK comprises construction to replace the sewer pipeline in Unionwood Drive to eliminate infiltration. Work consists of the removal of existing 8" concrete- lined sewer pipe and replacing with 8" PVC sewer pipe approximately 613 LF, reconnecting 19 service laterals, and modifications of 5 - 4' sewer manholes and associated work including but not limited to all excavation, dewatering, shoring, concrete, backfill, bypass pumping, traffic control, and site restoration necessary to complete the project in accordance with the plans and specifications to eliminate groundwater infiltration to the sewer system.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
28
Bidding Soon
535
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

March 8, 2023

img_map_placeholder

Unionwood Dr, Midvale, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.