BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mission Viejo, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Type 1 and Type 2 RPMS Slurry Seal and Crack Filling of Residential Streets Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the AGENCY in the minimum amount of ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a Contract is awarded fails or refuses to execute the Contract Documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all Contract Documents. The Performance and Payment Bonds shall be submitted before execution of the Contract. The Performance Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The Payment Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The AGENCY reserves the right to reject any bond if, in the opinion of the AGENCY Attorney, the Surety's acknowledgment is not in the form included in the Contract Documents or in another form substantially as prescribed by law. The award of contract, if made, will be to the most responsible Bidder as determined solely by the City, pursuant to the City's Plans, Specifications and Contract Documents and in the best interests of the City pursuant to law. At the time of contract award, the successful bidder shall hold the contractor's license(s) required in Notice Inviting Bids. Additionally, the AGENCY reserves the right to reject any or all Proposals, to accept any bid to waive any irregularity if allowed by law, and to take the bids under advisement for the period of time stated in the "Notice Inviting Bids," all as may be required to provide for the best interests of the AGENCY. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the bidder to whom the award is contemplated. Failure to timely submit a Claim, failure to include a Claim in the above Claim summary, or failure to comply with any of the Claim requirements in the Contract, including but not limited to this Article 4, will act as a complete waiver of Contractor's rights to (a) recover money or time on the issues for which a Claim was required, (b) submit a Government Code Claim for the money or time (see below), and (c) initiate any action, proceeding or litigation for the money or time, regardless of the merits, as Contractor will not have satisfied a condition precedent or exhausted administrative remedies. City does not have an obligation to reject the Claim for a failure to comply with any of the Claim requirements in the Contract, including the lack of certification; and any failure by City to reject, or any delay in rejecting, a Claim on that basis does not waive the City's right to reject the Claim on that basis at a later time. In no event may the Contractor reserve its rights to assert a Claim for a time extension or additional money beyond the timelines set forth in this provision unless the City agrees in writing to allow the reservation. "Completion" and "Complete"--Statutory definitions of "Completion" and "Complete" shall apply for those statutory purposes (for example, see Public Contract Code Section 7107 for release of retention, and Civil Code Section 9200 for stop payment notices and notice of completion). For all other purposes, including accrual of liquidated damages, claims, and warranties, "Completion" and "Complete" mean the point in the Work where (1) Contractor has fully and correctly performed all Work in all parts and requirements, including corrective and punch list work, and (2) City's representatives have conducted a final inspection that confirmed this performance. Substantial, or any other form of partial or non-compliant, performance shall not constitute "Completion" or "Complete." LIQUIDATED DAMAGES [Replace last sentence of first paragraph with the following:] For each calendar day the Work is not Complete in excess of the time specified in the Contract for Completion of the Work, as adjusted in accordance with Subsection 6-6, the Contractor shall pay to the Agency, or have withheld from monies due it, the sum of One Thousand Dollars ($1,000.00). [Replace first sentence of the last paragraph with the following:] Execution of the Contract shall constitute agreement by the Agency and Contractor that $1,000.00 per day is the minimum value of the costs and actual damage caused by the failure of the Contractor to Complete the Work within the allotted time. Liquidated damages against the Contractor, whether already accrued or estimated to accrue in the future; Complete sets of said Contract Documents may be obtained by emailing Rich Schlesinger, City Engineer at rschlesinger@cityofmissionviejo.org Please provide detailed bidders info in email. The email will be used to establish the "bidders list." For additional information, contact Richard Schlesinger, City Engineer at 949 470-3079 or rschlesinger@cityofmissionviejo.org.

Post-Bid

Roads / Highways

$1,200,000.00

Public - City

Paving, Site Work

5

6

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
555
Active Projects
239
Bidding Soon
3,999
All Active Projects
1,859
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 31, 2023

March 1, 2023

img_map_placeholder

Multiple Locations, Mission Viejo, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.