Site work for an educational facility in Canton, Georgia. Completed plans call for site work for a educational facility.

(the "Owner"), under the provisions of O.C.G.A. 36-91-1, et. seq. herein seeks competitive sealed Proposals from General Contractors (GCs) {for this project, the term "General Contractor" or "GC" as used throughout the Proposal Documents shall mean Site Development Contractor} for the construction of Cherokee High School Replacement (CHSR) Site Development Package (the "Project"). To provide GC services for the construction (site, building, and systems) of the Owner's Construction of the Project as specified per the Proposal Documents. The requirements for this Project, and the duties and responsibilities of the GC whose Proposal is accepted, are outlined in the Contract Documents which include the Instructions to Proposers; Contract for Construction and Incorporated General Conditions (the "Contract"); supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for the construction of the Project. The Owner reserves the right to make available other relevant documents or information concerning the Project. Final Questions Due September 20, 2022, not later than 2:00 p.m. Final Addendum Issued (if necessary) September 23, 2022, not later than 2:00 p.m. Intent to Bid Due Date: Sep 29th 2022, 2:00 PM EDT Anticipated Board Review and Approval October 20, 2022 Any Proposal submitted in response to this RFP should strictly comply with all requirements outlined in the Instructions to Proposers - Section 002116. Any such Proposal must contain the completed Proposal Form - Section 004213 setting forth the GC's proposed lump sum contract price for the complete construction of the Project in conformity with all requirements of the Contract Documents. Any Proposal must include a fully executed Bid Bond - Section 004313 in the amount of five percent (5%) of the proposed lump sum contract price (exclusive of any alternates and unit prices) in the exact form referenced. As noted above, any contractor submitting a Proposal must also complete and submit the required General Contractors Checklist and Certification - Section 002118.30, along with all referenced Owner's Standard Forms. For any work requiring a specialty or professional license, only licensed subcontractors may be submitted for consideration. In evaluating Proposals, the Owner may seek additional information from any Contractor concerning such GC's Proposal to construct the Project. Additionally, the Owner at its discretion, and in conformity with the applicable provisions of Georgia Law, the Owner may afford GCs an opportunity for subsequent discussion, negotiation, and revision of Proposals. The Owner reserves the right to reject any Proposals and to waive technicalities and informalities. The Owner intends to award the Contract to the responsible and responsive GC whose Proposal is determined in writing to be the most advantageous to the Owner, taking into consideration the following evaluation factors which are outlined in the Instructions to Proposers, Item P - Contract Award. Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance of the RFP until the final Board action of approval of Contract Award, the GC submitting a Proposal shall not initiate any communication or discussion concerning the Project, the RFP or the GC's Proposal or any part thereof with any employee, agent, or representative of the Owner. Any violation of this restriction may result in the rejection of the GC's Proposal. 202025-S Site work for future high school including clearing and grubbing, grading, retaining 4 walls, curb and gutter, and paving subgrade.

Under Construction

Educational

$23,106,965.00

Public - County

Site Work

109

18

20

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
74
Bidding Soon
1,521
All Active Projects
566
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

November 28, 2022

img_map_placeholder

200 Hickory Log Dr, Canton, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.