BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a transportation facility in Carlsbad, California. Completed plans call for site work for a transportation facility.

Palomar Airport Rubber Removal Rubber Removal Service: a) The contractor shall be responsible for providing all materials, labor, traffic control signage, personnel and equipment for the preparation and removal of rubber on Runway surfaces by ways of Ultra High Pressure Water blasting method to leave all pavements within a minimum of 85% of rubber removal. A visual determination by Airports Maintenance Manager and or engineer will be the final determining factor for contract compliance. This is to ensure future pavement markings are acceptable to FAA Standards. Contractor must have complete vacuum recovery at the water blast head to prevent water runoff and include a water recycling system to save water. Use of sweepers for water and material recovery is not acceptable. b) The contractor shall be responsible for storage, disposal and handling of all materials and recycled water in accordance with County health codes and standards. Any fines, fees or related compliance matters are solely the responsibility of awarded contractor and any related sub-contractors. A bill of Lading Manifest is to be provided to County of San Diego Airports upon project completion.

Post-Bid

Transportation Terminals

$100,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
101
Bidding Soon
2,288
All Active Projects
1,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

October 7, 2022

img_map_placeholder

2198 Palomar Airport Rd, Carlsbad, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.