Published October 4, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Pikeville, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 4. 2022, project was awarded toHALL & SON CONTRACTING INC awarded amount $288,932.50.** 1. 22AML008- Shannon Johnson Slide High Priority AML Reclamation Project PIKE COUNTY The proposed project (approximately 1.1 acres) consists primarily of installing a two gabion retaining walls to stabilize the driveway to the Shannon Johnson residence. The project area is located at N 37 19' 6.272", W 82 38' 34.757". The site address is 1597 Turkey Pen Road, Virgie, KY 41572. Reclamation work consists of constructing a 112 L.F. gabion wall to stabilize the driveway to the Shannon Johnson residence. The wall will begin as 12' tall on the farthest end from the residence and continue for the first 40 L.F. The wall will then become 15' tall for the next 40 L.F. and finish with 32 L.F. of 18' high gabions. Another 50 L.F. of 12' tall gabion wall will be constructed to address a smaller slip above the larger slide. A Class II ditch will be constructed in front of this shorter wall to direct drainage off the driveway. At the base of the hill, 40 L.F. of 24" HDPE pipe with concrete headwalls on each side will be installed to direct drainage under the driveway and into the existing drainage ditch. A safety fence will be installed above both gabion walls. Finally, the open portal behind the residence will be closed with two wildlife-accessible portal closures. All disturbed areas shall be graded to allow positive drainage and re-seeded as depicted in the plans and directed by the ENGINEER. Traffic Control is included for the passage of motorist at the site. The waste area for this project is located approximately 19.0 miles from the project site and has been used for multiple previous AML projects. The coordinates for the waste area are N 37 25' 37.981", W 82 32' 0.751". All work shall be completed within ONE HUNDRED TWENTY (120) calendar days

Award

Roads / Highways

$288,932.00

Public - County

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
55
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

October 14, 2022

Project location map

Multiple Locations, Pikeville, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.