BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Columbus, Mississippi. Completed plans call for the renovation of a laboratory facility.

Amendment 7: **ATTENTION PLEASE READ** The purpose of this amendment to the Solicitation for the B246 NDI Lab Bathroom Renovation project FA302222R00090003, is to update the SOW, extend the proposal due date, and offer a second site visit opportunity. Due to the RFIs recieved, the scope of this project has changed. Please view the SOW attachment titled "Attachment 1 - NDI Lab Revised SOW Dated 13 Sep 2022" and the concept drawings located on pages 14 & 15 of "Attachment 4 - Pertinent Drawings and Documents" for further details. Due to the SOW change, the Government is offering a second site visit opportunity on 19 September 2022 at 1:00 PM CST, and extending the proposal due date to 21 September 2022 at 11:59 PM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Thursday, 15 September 2022. If you do not contact the POC by 4:30 PM CST on 15 September 2022, you will not be able to attend the site visit. All additional RFIs must be submitted NLT 11:59 PM CST on 19 September 2022. Amdendment 6: The answers to RFI's submitted through 7 September 2022 have been posted in the attachments. The access to attachement RFI-As Built Drawings, RFI- Asbestos Report, RFI- CAD, are marked Controlled IAW Air Force Controlled Unclassified Information regulations, please request access in order to view it. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 5: The answers to RFIs submitted through 7 September 2022 will be posted in the attachments by COB 12 September 2022 instead of 9 September 2022 due to aquiring additional information for answers. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 4: The Solicitation has been changed to reflect an extention to the Proposal Due Date by 3 calendar days from 12 September 2022 to 15 September 2022. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 3: The Statement of Work (SOW) for this requirement has been updated. The previous "Attchament 1 - SOW Dated 3 Aug 2022" has been redacted and replaced with the revised SOW dated 1 September 2022. Also, the access to attachement 4 for drawings has been changed IAW Air Force Controlled Unclassified Information regulations, please request access in order to view it. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 2: This Solicitation was amended in order to incorporated Wage Determination MS20220045, Modification 2, dated 25 February 2022 into the solicitation, and remove DFARS 252.219-7009. Please also note that the answers to RFIs submitted through 30 August 2022 have been posted in the attachments. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. Amendment 1: This opportunity was originally listed under Notice ID FA302222R0008, and is now listed under Notice ID FA302222R0009. This requirement's opportunity notice was redacted and reissued in order to change the form of the solicitation document from Standard Form 1449 to Standard Form 1442. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email. The subject requirement is to complete a full renovation of the existing co-ed restroom and provide separate men's and women's restrooms as well as the installation of a new shower system in each restroom of Building 246 at Columbus Air Force Base. The Contractor shall provide all plant, labor, equipment, transportation, and tools required, and perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. All questions and answers from the Site Visit will be recorded by a Base Contracting representative and they will then be publicized for everyones access. Prevailing Wage Rate: Yes Performance Bond: 100% Payment Bond: 100% SBE Goal: 100% Completion Days: 210 Calendar Days

Post-Bid

Laboratories

$250,000.00

Public - Federal

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
54
Bidding Soon
619
All Active Projects
326
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2022

October 21, 2022

May 19, 2023

img_map_placeholder

555 Simler Blvd, Columbus, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.