Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a stadium in Fort Scott, Kansas. Working plans call for the renovation of a stadium.
Fort Scott Community College (FSCC) is in the process of installing a HVAC system in Arnold Arena gymnasium. Scope of work: Provide and install one approximately 25 ton ground mounted package unit on southwest face of arena building to serve arena space. Provide a fabric duct equal to DuctSox Sedona XM with internal hoop supports along each side of gymnasium, ducts shall be approximately 26"O each. Fabric supply ducts shall be routed tight to bottom of metal building rigid frames. Route rectangular supply and return ducts from packaged unit up to above second floor storage area above locker rooms to southwest wall of gymnasium area. Return air grill to be mounted just above second floor storage area floor level. Provide power for package unit from nearest electrical panel large enough to serve additional electrical load, circuit may need to be brought from main electrical room on north end of building. Contractor to verify existing electrical service is capable of serving additional HVAC electrical load. All sizes indicated above are approximate and should be verified by design build contractor prior to bidding and final design shall be stamped by a licensed professional engineer in the state of Kansas. General Method of Procedure A. Working space and space available for storing materials shall be verified with the Owner prior to construction. B. Workmen are subject to rules of the Owner applicable to their conduct. C. Building will be occupied during performance of work, but areas of alterations will be vacated as required. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in Owner operations will not be hindered. Contractor shall permit access to Owner personnel through construction areas. Contractor to provide temporary means of protected access to all occupied areas of alteration during the construction period. D. Utilities Services: Maintain existing utility services for building at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing systems, they shall be cut and capped at suitable places where approved by owner. Contractor shall submit a request to interrupt any such services to Owner 48 hours in advance of proposed interruption. E. Protection: Provide following protective measures: a. Temporary protection against damage for all portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated. b. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed. Applicable State Laws A. Contractor and all subcontractors of all trades present on site shall comply with state and local laws and ordinances while present on public property. B. Absolutely no tobacco or e-cigarette use is permitted in building or on the project site. Restoration A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise directed, do not cut, alter or remove any structural work. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to Owner before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise directed by owner. B. Upon completion of contract, deliver work complete and undamaged. Damage caused by Contractor or Contractor's workmen to existing structures, grounds, and utilities or work done by others shall be repaired by Contractor and left in as good condition as existed prior to damaging. A. Consequential damage to Owner's existing equipment or building contents in the existing building or on site as a result of work being performed will be replaced at Contractor's expense. Winning bid will be notified after approval by the Board of Trustees. Fort Scott Community College reserves the right to reject all bids. If there are any questions, please email them to Jared Keylon, jaredk@fortscott.edu. Address Fort Scott Community College ATTN: Julie Eichenberger - Arnold Arena - HVAC System 2108 South Horton Street, Fort Scott, KS 66701 Digital Subject: Arnold Arena - HVAC System Bid rfp@mailboxes.fortscott.edu
Final Planning
Arenas / Stadiums
$50,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2022
March 26, 2023
2108 S Horton St, Fort Scott, KS
Related To This Project
Fort Scott, KS
Bid Date: Aug 18 2022
Fort Scott, KS
Bid Date: Jan 04 2023
Fort Scott, KS
Bid Date: Feb 21 2023
Fort Scott, KS
Bid Date: Feb 28 2023
Fort Scott, KS
Bid Date: Feb 28 2023
Fort Scott, KS
Bid Date: Feb 28 2023
Fort Scott, KS
Bid Date: Mar 31 2023
Fort Scott, KS
Bid Date: Aug 25 2022
Fort Scott, KS
Bid Date: Jan 25 2023
Fort Scott, KS
Bid Date: Jan 25 2023
Fort Scott, KS
Bid Date: Aug 12 2022
Fort Scott, KS
Bid Date: Aug 25 2022
Fort Scott, KS
Bid Date: Jul 15 2022
Fort Scott, KS
Bid Date: Jun 18 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.