Site work and paving for a mixed-use development in New Madrid, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NOT CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement to this synopsis or any follow up information requests. The U.S. Army Corps os Engineers, Memphis District has been tasked to solicit and award a project for the repair of damaged portions of the New Madrid boat ramp concrete slab, repair of the existing subbase/subgrade near damaged portions of the boat ramp, constructing new cast-in-place and push-in-place concrete slabs over of the existing ramp, armoring the river side and land side of the boat ramp to safeguard against scouring, and any incidental related work according to the specifications and plans. The government intends to issue a solicitation: however, the results and analysis of the market research will finalize the determination of procurement method. The type of set-aside, if any, decision to be issued will depend upon the capabilities of the responses to this synopsis. The work shall be located within New Madrid County, MO. EXISTING WORK In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements": a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started. LOCATION OF UNDERGROUND FACILITIES Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated to be installed or removed, but indicated or discovered during work to be conducted or installed. For further instructions and details, see the paragraph entitled, "OBSTRUCTIONS" in Section 00 80 00.00 11 SPECIAL CONTRACT REQUIREMENTS. WORK PERFORMED BY OTHERS The Graded Stone "C" required around the boat ramp as indicated on the plans will be installed by others. The contractor is not be responsible for providing the Graded Stone "C" for this contract. The contractor is, however, responsible for adjusting and relocating the Graded Stone "C" already provided on site as necessary when completing the boat ramp construction. ORDER OF WORK Completion of the work as described in the contract documents shall follow a specific order of work as outlined in this section. Preconstruction Submittal - Contingency Plans Prior to any work commencing, the contractor shall submit a plan detailing all sequencing and adequate measures to be taken by the contractor to ensure the boat ramp will remain operational in the event of rising water levels resulting in portions of work not being able to be completed. This plan shall include detailed courses of action and proposed contingency plans at various stages of work. Repair of Existing Subbase/Subgrade The contractor shall repair the existing subbase/subgrade in accordance with the contract documents prior to constructing any slabs (push-in-place or cast-in-place, temporary or permanent) over the affected portion of subbase/subgrade. Grade Beam Construction The contractor shall complete the construction of the concrete grade beam in accordance with the contract drawings. Contractor shall properly prepare the foundation and the area immediately adjacent to the location of the new grade beam as to limit the amount of demolition and disturbance of adjacent features. Verification Prior to Push-in-Place Slab Placement Prior to placing the new push-in-place slab, the contractor shall ensure subbase is stable, and free of voids for accepting the new push-in-place slab. This includes conducting any necessary surveys or using other methods to determine subbase conditions. The contractor shall also verify that no obstructions exist that would hinder placement of the push-in-place slab or that would damage the slab during placement. The contractor shall adjust and relocate existing Graded Stone "C", as necessary, to ensure a stable base. New Push-in-Place Slab The contractor shall complete the construction and placement of the new push-in-place slab. Surface preparation of the existing push-in-place slab shall be done prior to placing the new slab, in accordance with the contract documents. New Cast-in-Place Slab The contractor shall complete the construction of the new cast-in-place slab over the existing cast-in-place slab. Surface preparation of the existing cast-in-place slab shall be done prior to placing the new slab, in accordance with the contract documents. General Requirements Work shall be scheduled and accomplished in a manner that leaves the boat ramp operational in the event water levels rise and all work cannot be completed. The estimated cost of the proposed construction is between $1,000,000.00 and $2,000,000.00. The Estimated duration of the project is TBD. The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $39.5 Million. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement. If a large business firm is selected for this announcement, they must also comply with the FAR 52.219-9 clause regarding the requirement for an approved subcontracting plan. Firm's response to this Synopsis shall be limited to 5 pages and shall include the following information: 1. Firm's name, address, point of contact, phone number, and e-mail address. 2. Firm's interest in bidding on STATEMENT OF WORK of the subject solicitation when it is issued. 3. Firm's capability to perform a contract of this magnitude and complexity, including the firm's capability to execute construction comparable work performed within the past five years. Incorporate a brief description of the project, customer's name, timeline of performance, customer satisfaction and dollar value of the project - provide at least three examples. 4. Firm's Size: Large, small business category and business size, (Small Business, HUB Zone, Service Disabled Veteran Owned Small Business, Woman Owned Small Business, or 8(a)). 5. Firm's Joint Venture information if applicable - existing and potential. 6. Firm's Bonding Capability (bonding level per contract and aggregate bonding level, both expressed in dollars, via letter from the bonding company). Interested Firms shall respond to this Sources Sought Synopsis no later than 10:00 a.m. CST 9 SEP 2022 via email only. All interested firms must be registered in SAM (www.sam.gov) to be eligible for award of Government contracts. Please email your response to: Kimberly Bass, Contract Specialist Contracting Division, USACE - Memphis District, Memphis, TN Email: kimberly.e.bass@usace.army.mil The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$2,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
39
Bidding Soon
469
All Active Projects
202
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 8, 2023

img_map_placeholder

To Be Determined, New Madrid, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.