BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in El Paso, Texas. Completed plans call for site work for a service station / car wash facility.

EPWater owns and operates distinct wells, pump stations, and treatment facilities located in El Paso, Texas. EPWater plans to add backup generators to approximately 24 sites, as shown in Table 1, to improve the existing operations capacity during events of power outage. The CMAR services will include the pre-purchase of the backup power generators. At the same time, EPWater will procure design services for all of the generators EPWater plans to install a new aboveground diesel fuel storage and dispensing system at two sites. Each fuel storage system will have a maximum storage capacity of 50,000 gallon. The first site is located at 7280 Bosque Road, Canutillo, TX 79835. The second site is located at 12123 Dyer St, El Paso, TX 79934. Phase I preconstruction services encompass constructability reviews, value engineering, estimating, and scheduling activities. Phase I is complete upon agreement cost, terms and award of the multiple guaranteed maximum price (GMP) proposals in accordance with the Construction Procurement Plan. By the end of Phase I, all 100% designs submittal reviews are completed, and any GMP proposal reconciliations are revised as required. The CMAR Firm will provide preconstruction services to support EPWater's Design Engineers in developing the designs for generators and the Diesel Fuel Storage and Dispensing Systems. During the design phase, the Design Engineers will advance designs to the 60% level of completion necessary to define the project and will provide these documents to EPWater and the CMAR Firm. Based on these documents, the CMAR Firm will present to EPWater a construction schedule for all project sites and the multiple GMPs, including the cost of the work through commissioning and start-up. The CMAR Firm will support the Design Engineers to advance design submittals from 60% through 90% until the draft 100% submittal is reached. At the Draft 100% Design stage, the CMAR may be tasked to perform Value Engineering (VE) on all designs along with a Constructability Review Workshop. Phase II construction services, when EPWater and CMAR Firm have agree on the construction price, the construction phase begins, in which the CMAR assumes the general contractor role, encompassing full construction, startup and commissioning of the project including warranty and closeout. The purpose of this RFEI is to notify the marketplace of the upcoming release of the RFP and provide potential proposers with general information concerning the project and the procurement. EPWater is requesting potential proposers express their interest in this opportunity by sending a one-page letter expressing your interest in the project and the name, title and email address of the person EPWater should send the RFP to. Please send the letter to purchasing.info@epwater.org. o Award CMAR Contract January 11, 2023 o Deadline for questions October 23, 2022 o EPWater publishes clarifications October 31, 2022

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
9
Bidding Soon
246
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

January 18, 2023

img_map_placeholder

Multiple Locations, El Paso, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.