Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in El Paso, Texas. Completed plans call for site work for a service station / car wash facility.
EPWater owns and operates distinct wells, pump stations, and treatment facilities located in El Paso, Texas. EPWater plans to add backup generators to approximately 24 sites, as shown in Table 1, to improve the existing operations capacity during events of power outage. The CMAR services will include the pre-purchase of the backup power generators. At the same time, EPWater will procure design services for all of the generators EPWater plans to install a new aboveground diesel fuel storage and dispensing system at two sites. Each fuel storage system will have a maximum storage capacity of 50,000 gallon. The first site is located at 7280 Bosque Road, Canutillo, TX 79835. The second site is located at 12123 Dyer St, El Paso, TX 79934. Phase I preconstruction services encompass constructability reviews, value engineering, estimating, and scheduling activities. Phase I is complete upon agreement cost, terms and award of the multiple guaranteed maximum price (GMP) proposals in accordance with the Construction Procurement Plan. By the end of Phase I, all 100% designs submittal reviews are completed, and any GMP proposal reconciliations are revised as required. The CMAR Firm will provide preconstruction services to support EPWater's Design Engineers in developing the designs for generators and the Diesel Fuel Storage and Dispensing Systems. During the design phase, the Design Engineers will advance designs to the 60% level of completion necessary to define the project and will provide these documents to EPWater and the CMAR Firm. Based on these documents, the CMAR Firm will present to EPWater a construction schedule for all project sites and the multiple GMPs, including the cost of the work through commissioning and start-up. The CMAR Firm will support the Design Engineers to advance design submittals from 60% through 90% until the draft 100% submittal is reached. At the Draft 100% Design stage, the CMAR may be tasked to perform Value Engineering (VE) on all designs along with a Constructability Review Workshop. Phase II construction services, when EPWater and CMAR Firm have agree on the construction price, the construction phase begins, in which the CMAR assumes the general contractor role, encompassing full construction, startup and commissioning of the project including warranty and closeout. The purpose of this RFEI is to notify the marketplace of the upcoming release of the RFP and provide potential proposers with general information concerning the project and the procurement. EPWater is requesting potential proposers express their interest in this opportunity by sending a one-page letter expressing your interest in the project and the name, title and email address of the person EPWater should send the RFP to. Please send the letter to purchasing.info@epwater.org. o Award CMAR Contract January 11, 2023 o Deadline for questions October 23, 2022 o EPWater publishes clarifications October 31, 2022
Post-Bid
Water / Sewer
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 15, 2022
January 18, 2023
Multiple Locations, El Paso, TX
Related To This Project
El Paso, TX
Bid Date: Oct 18 2022
El Paso, TX
Bid Date: Oct 31 2022
El Paso, TX
--
El Paso, TX
Bid Date: Sep 16 2022
El Paso, TX
--
El Paso, TX
Bid Date: Oct 06 2022
El Paso, TX
Bid Date: Jun 26 2019
El Paso, TX
--
El Paso, TX
Bid Date: Nov 07 2022
El Paso, TX
Bid Date: Nov 17 2022
El Paso, TX
Bid Date: Nov 02 2022
El Paso, TX
--
El Paso, TX
Bid Date: Oct 19 2022
El Paso, TX
Bid Date: Oct 19 2022
El Paso, TX
Bid Date: Oct 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.