BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Geneva, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention Portal, to be received no later than 2:00 p.m on September 15. 2022 The work to be done under this contract shall be started on or about January 16. 2023. All work under this contract shall be completed by Seder:ober 25 7071. The location of services to be performed is the Reagan Memorial Tolway (1-88) between Mile Post 115.4 EB and Mile Post 120.3 WB in DuPage County and Kane County, Illinois. The scope of the work shall consist of the Installation of two (2) VVVIM stations. the installation of new conduit, power conductors, and fiber optic cables, Maintenance of Traffic (MOT) during constriction activities, and civil site improvements. Bidders may be required to be pre-qualified by the Ilinois Department of Transportation (IDOl). IDOTPrequallfication required: OYES ONO If 'NO', Ignore any reference to IDOT Prequatikation within the remainder Of this document. Joint Ventures shall be limited to no more than three (3) individually IDOT pre-qualified members. ithaters are also required to be registered. or submit evidence of apptication, with the Illinois Department of Human Rights (IDHR) There are NO EXCEPTIONS. A completed Questionnaire and a statement of current Contractual obigations on forms supplied by the Ilfinois Totway will be required from the apparent low bidder once the apparent low tickler is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the Wind. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft. certified check or cashier's check drawn on a solvent bank made payable to the Ilinois State Toll Highway Authority. Award of the above contract, if any award be made, wai be to the lowest responsive and responsible bidder or bidders. The Tolway reserves the right to reject any and all bids. to waive technicalities, or cancel the solicitation. If yes, BEP Goal Percentage: 25.00000 If yes, VBP Goal Percentage: 3.00000

Bid Results

Roads / Highways

$3,228,784.00

Public - City

Paving, Site Work

552

7

2

9

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
116
Bidding Soon
1,780
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2022

January 16, 2023

img_map_placeholder

Multiple Locations, Geneva, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.