Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Monroe, Michigan. Conceptual plans call for site work for a water / sewer project.
REQUEST FOR SOURCES SOUGHT (NOT A NOTICE OF SOLICITATION) The United States Army Corps of Engineers (USACE), Detroit District is seeking information on potential sources and feedback on the product requirements as identified under the project description paragraph. This Sources Sought Notice will be utilized by USACE, Detroit District to establish a list of sources interested in the Monroe Harbor Advanced Maintenance Dredging project. Interested sources are encouraged to respond. The results from this market research will contribute to determining the method of procurement if a requirement materializes. Based on the responses, this requirement may be set aside for small businesses (in full or in part) or procured through full and open competition. All small business set-aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding submissions. The estimated magnitude of construction is between $1,000,000 and $5,000,000. Background information on potential project: The project is for Monroe Harbor Advanced Maintenance Dredging with Confined Disposal Facility (CDF) placement. Monroe Harbor, Michigan is located on the lower reach of the River Raisin, which empties into Lake Erie and is 36 miles south of Detroit, Michigan. Mobilize dredge to Monroe Harbor and dredge in areas of the turning basin to depths up to 20 feet below LWD plus overdepth and areas of the upstream end of the federal navigation channel to depths up to 23 feet below LWD plus overdepth. LWD is at Elev. 569.2. The dredge material is anticipated to range from soft silt with some clay to hard silty clay with sand and gravel. Presence of cobbles, boulders, rock fragments, wood, and other debris is also anticipated. Placement of dredged material will be in Pointe Mouillee CDF. Demobilize when dredging work is complete. Name of Firm: __________________________________ Address: ___________________________________ City: ________________________ State: _____________ Zip: _______________ UEI: _____________________________ CAGE Code: __________________ Point of Contract: _____________________ Telephone: ___________________ Email Address: _______________________ 1. Is your firm registered in the System for Award Management (SAM) ____ Yes ____ No 2. Business Size Standard: Mark all that apply for North American Classification (NAICS) Code 237990. See Code of Federal Regulations, Title 13, Chapter 1, Part 121 - Small Business Regulations. ____ Small Business ____ Small Disadvantaged Business ____ SDB Certified to include 8 (a) ____ Service-Disabled Veteran Owned Small Business (SDVOSB) ____ HUBZone ____ Veteran-Owned Small Business ____ Women-Owned Small Business (WOSB) ____ Large Business 3. Does your SAM profile show the NAICS Code 237990 (Other Heavy and Civil Engineering Construction) on your assertions ____ Yes ____ No 4. Has your firm performed work under NAICS 237990, Other Heavy and Civil Engineering Construction for an advanced maintenance dredging construction contract ____ Yes ____ No You may attach a one-page document with the title of the project, description, magnitude, period of performance, dollar value, and the roll that you performed within the last five years. 5. Provide a two (2) page document describing your experience with advance dredging and maintenance as described in the "background information on potential project" section of this sources sought notice. 6. Is your firm capable of performing a dredging contract for a magnitude of construction between $1,000,000 and $5,000,000 ____ Yes ____ No If you checked yes, please attach a one-page document describing this project. 7. Bonding Capability Individual Contract Bonding Capacity: $________________________ Aggregate Contract Bonding Capacity: $________________________ 8. Is your firm capable of performing work within the boundaries of Monroe, Michigan ____ Yes ____ No If you have performed Civil Engineering work in the Monroe area, please explain the type of work (location/project title/magnitude/description/award amount/d mm/dd/yy _______________ 10. The Government may utilize additional past performance history from previous contracts found in the Contractor Performance Assessment Reporting System (CPARS) when reviewing Contractor capabilities. Note: The last five posted may be reviewed. ____ Contractor Acknowledges Do you have a CPARS rating in the system that pertains to the requirement ____ Yes ____ No If yes, you may provide the contract number ________________ (advanced dredging construction) for this rating and it will be pulled as one of the five CPARS ratings pulled from the system. 11. If this requirement is advertised, do you anticipate submitting a bid The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$5,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2023
To Be Determined, Monroe, MI
Related To This Project
Monroe, MI
Bid Date: Sep 02 2022
Monroe, MI
Bid Date: Sep 12 2022
Monroe, MI
Bid Date: Aug 10 2022
Monroe, MI
Bid Date: Sep 29 2022
Monroe, MI
Bid Date: Jan 13 2023
Monroe, MI
Bid Date: Nov 29 2022
Monroe, MI
Bid Date: Jan 30 2023
Monroe, MI
Bid Date: Apr 07 2023
Monroe, MI
Bid Date: Aug 12 2022
Monroe, MI
Bid Date: Aug 23 2022
Monroe, MI
Bid Date: Jul 28 2022
Monroe, MI
Bid Date: Jul 27 2022
Monroe, MI
Bid Date: Jun 06 2022
Monroe, MI
Bid Date: Jun 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.