BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Pacifica, California. Completed plans call for the construction of a educational facility; for site work for a educational facility; and residential development.

Vallemar School will install 5 portable classrooms over existing asphalt this fall, to serve as swing space to enable construction to a classroom building starting Jan 2023. The project includes a new fire line and fire hydrant, electrical, fire alarm, data/ low voltage. Work does not include utilities of water, sewer, or storm drain. Work also includes small asphalt transition ramp, fencing, minor demolition. A. Installation: Installation of a new fire line and fire hydrant; electrical, fire alarm, data/ low voltage, clock and speaker system, serving the five new portables; All conduits and wires shall be concealed in walls and ceilings. small asphalt transition ramp at the end of portable metal ramp; chain link fence and service gate; room control signage at the portable exterior doors; demolition of a few existing basketball pole and backstop in conflict with the new portables. B. Disconnection, removal and patch back: At the portable removal, disconnect all electrical, data/low voltage, fire alarm, clock and speaker systems. Restore and reprogram all services affected. See electrical drawings for point of termination. For portable removal purposes, all wiring and conduits entering the portables shall be cut off at the portable exterior wall. All conduits and wiring attached to the exterior of the portables shall be removed. Any wiring and conduits left inside the portables do not need removal. Any fire alarm devices installed on the portables do not require removal. Remove asphalt transition ramps and patch back to pre-ramp condition patch back asphalt caused by portable foundation. Remove the chain link fence and gate. Fill holes with concrete. C. The following work is directly contracted with the District but the GC under this contract shall schedule, arrange, coordinate and manage services provided by the following parties: 1) Mobil Modular will provide and install the portables, metal ramp, closure panel between the portables. The portables are equipped with HVAC, interior lighting, all interior electrical outlets, white boards. 2) Mobil Modular will remove and haul away the portables; 3) Staking of the portable location; 4) Intrusion Alarm installation and disconnect by Bay Alarm. D. Temporary Construction Fence is required for the duration of the project. E. Work does not include: 1) sink water, sewer, or storm drain. The following work is directly contracted with the District but scheduling, installation and services shall be arranged and managed by the General Contractor: Mobil Modular will provide and installation the portables; Staking of the portable location; Intrusion Alarm by Bay Alarm. The work also includes disconnecting the utilities when the portables are being removed at the end of school year in June 2023, scheduling portable removal and haul away, removing any asphalt transition ramps and any asphalt patch backs.The entire operation shall be enclosed with temporary construction fencing with fabric screen. The email address is smeng@pacificasd.org. All questions or inquiries should also be forwarded to her via email or call (650)738-6686. Prequalification of the General Contractor, bid bond, other bonds and insurances and prevailing wage are required for the project. Contractors that have already been prequalified on previous projects with the District within a year do not need to resubmit for prequalification. No bidder may withdraw his bid/proposal for a period of sixty (60) days after the date set for the opening bids. The District reserves the right to reject any and all bid/proposals and to waive any informalities or irregularities in any bid.

Bid Results

Educational

$530,054.00

Public - County

New Construction, Site Work

90

16

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
85
Bidding Soon
1,776
All Active Projects
722
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.