EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a transportation facility in Greenville, Pennsylvania. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.

*Per owner, all bids rejected, this will rebid at a future time.* The Borough of Greenville will receive proposals for the Snow Removal Equipment Building at the Greenville Municipal Airport. Bids must be submitted on the prescribed forms furnished with the Drawings, Specifications, and other Contract Documents, and shall be in accordance with the Instructions to Bidders. The successful bidder will be required to start work within ten (10) calendar days after Notice to Proceed and to complete the work within the times specified in the Contract Agreement after the Notice to Proceed, with liquidated damages of $850.00 per calendar day for failure to complete the work on time. Notice to Proceed will be issued for construction during the 2022 construction season. Each bidder must submit with his proposal a bid security in an amount equal to at least ten percent (10%) of his bid. Said security shall be in the form and subject to the conditions given in the Instructions to Bidders. No bidder may withdraw his bid within ninety (90) days after the actual date ofthe opening. The successful bidder will be required to pay his employees at w'age rate not less than those contained in the wage determination decisions ofthe United States Secretary of Labor. The bidders attention is called to Section 30, 31, 32, and 33 of the contract Special Provisions which contains bid requirements and EEO requirements for federal contracts. Attention is also directed to the requirement of the Special Provisions regarding Disadvantaged Business Enterprises as defined in 49 CFR Part 26. The bidder shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, Regulations ofthe Office ofthe Secretary ofTransportation, to subcontract (8.87) percent ofthe dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). All DBE firms used to meet this goal must be certified by the Pennsylvania Unified Certification Program (PA UCP). Certification as a DBE by the PA UCP is separate and distinct from certification programs In the event that the bidder for this solicitation qualifies as a DBE, the contract goal shall be deemed to have been met. Individuals who are rebuttably presumed to be socially and economically disadvantaged include women. Blacks. Hispanics, Native Americans, Asian-Pacific Americans, and Asian-Indian Americans. The apparent successful competitor will be required to submit information concerning the DBE's that will participate in this contract. The information will include the name and address ofeach DBE, a description ofthe work to be performed by each named firm, and the dollar value ofthe contract. Ifthe bidder fails to achieve the contract goal stated herein, it will be required to provide documentation demonstrating that it made good faith efforts in attempting to do so. A bid that fails to meet these requirements will be considered nonresponsive.

Final Planning

Transportation Terminals

$350,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Windows
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Facility Water Distribution Piping, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
134
Bidding Soon
1,226
All Active Projects
568
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2022

October 19, 2022

img_map_placeholder

511 E Jamestown Rd, Greenville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Snow Removal Equipment Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.