BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Temple Terrace, Florida. Completed plans call for site work for a water / sewer project.

Phase 3 of the St. Augustine and Live Oak Water Main Replacement Project generally involves the installation of new water mains and services within the rights-of-way of St. Augustine Avenue, Brentwood Avenue, Biltmore Avenue, Glen Arven Avenue, and Riverhills Drive. The Base Bid project includes the installation of approximately 2966 linear feet of 6-inch C900 PVC water main, 993 linear feet of 8-inch C900 PVC water main, fittings, gate valves, fire hydrants, other appurtenances, abandonment and/or removal of approximately 6,584 linear feet of old 4-inch and 6-inch water mains and project restoration of sod, curbs, pavement, and sidewalk. There is 1 exploratory excavation in the work area to be performed as part of the project work. Additionally, 66 new potable water services and 66 irrigation services are to be relocated and installed on private property to connect the residential customers to the new water mains located in the front of the lots in the public rights-of-way. There is an Additional Alternate to include mill and resurfacing on St. Augustine Avenue, Brentwood Avenue, Biltmore Avenue, Glen Arven Avenue, and Riverhills Drive as shown on the plans.

Award

Water / Sewer

$1,465,490.00

Public - City

Site Work

39

13

10

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
53
Bidding Soon
1,285
All Active Projects
506
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

December 5, 2022

img_map_placeholder

Multiple Locations, Temple Terrace, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.