BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Ferguson, Missouri. Completed plans call for the renovation of a educational facility.

The Ferguson-Florissant School District is requesting to have the insulation that was originally installed on the HVAC pipe replaced. The insulation must be replaced with 1/2 " thickness or greater Armaflex or a comparable type of insulation. All visible insulation must be replaced in the hallway of the lower lever of the school. The insulation must be replaced with the appropriate diameter insulation for all pipes, fittings and valves. Insulation must be installed to meet all local, county, state and federal guidelines. Purchase Orders for items on which proposals are accepted will be issued to the lowest responsible bidder complying with all of the Terms and Conditions. However, the Board of Education reserves the right to make such selections that, in its judgment, are best suited and most acceptable for the purpose intended. The quality of goods, products, materials, equipment, workmanship and services shall be as described and must be to the satisfaction of the district representative. He shall have full power and authority to reject any materials furnished that, in his opinion, are not in strict conformity with the specifications, or equal in every respect to the exact item described therein. All goods, products, materials, and equipment furnished shall be factory new and any deviation there from will constitute just cause for rejection unless otherwise specified. The school District reserves the right to increase or decrease by ten percent (10%) the quantity of any item in the specifications on which proposals are accepted. If the proposal exceeds $10,000, the contractor shall submit with the proposal a cashier's check, certified check or acceptable bidder's bond payable to the school district in an amount not less than 5% of the amount of the bid submitted, as a guarantee that if awarded the contract the bidder shall promptly enter into a contract and execute such bonds as required. The owner shall require the successful bidder to furnish a Performance Bond and Labor and Materials Payment Bond prior to the execution of the contract. The bonds shall be written in the amount of 100% of the total contract price. The Board of Education reserves the right to reject any or all proposals or any part thereof.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
39
Bidding Soon
826
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

img_map_placeholder

201 Wesley Ave, Ferguson, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.