Site work and paving for a mixed-use development in Ferguson, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

(1): Job J6S3599 Route N ST LOUIS County. Resurface and ADA improvements from 0.75 north of I-70 to Route 115, the total length of improvement being 1.95 miles. Range: $5M to $7.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. Question Deadline 04/12/2024 - Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. DBE Goal Percent: 10.00 Contract Time: : 6/1/26 MO DOT- F05 - Resurface and ADA Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$6,155,783.00

Public - State/Provincial

Paving, Site Work

271

8

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Paving Specialties, Pavement Markings
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
38
Bidding Soon
650
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

June 3, 2024

img_map_placeholder

State Highway N, Ferguson, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.