BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construct asphalt concrete speed humps at the following locations: ST211160144 N. 9th St. - W. Keefe Ave. to W. Atkinson Ave. 1 ST211210262 N. 17th St. - W. Vienna Ave. to W. Atkinson Ave. 1 ST211210263 N. 19th St. - W. Finn Pl. to W. Nash St. 1 ST211220210 N. 28th St. - N. Teutonia Ave. to W. Fairmount Ave. 1 ST211220141 N. 33rd St. - W. Villard Ave. to W. Custer Ave. 2 ST211220194 N. 37th St. - W. Glendale Ave. to N. Hopkins St. 1 ST211220145 N. 38th St. - W. Custer Ave. to W. Sheridan Ave. 1 ST211220188 N. 38th St. - W. Marion St. to W. Congress St. 1 ST211220173 N. 40th St. - W. Congress St. to W. Ruby Ave. 1 ST211220174 N. 40th St. - W. Glendale Ave. to W. Courtland Ave. 1 ST211220215 N. 40th St. - W. Courtland Ave. to W. Hampton Ave. 1 ST211220140 N. 40th St. - N. Hopkins St. to W. Villard Ave. 1 ST211220189 N. 41st St. - W. Keefe Ave. to W. Nash St. 1 ST211220165 N. 47th St. - W. Fairmount Ave. to W. Eggert Pl. 2 ST211220163 N. 48th St. - W. Luscher Ave. to W. Fairmount Ave. 2 ST211220146 N. 49th St. - W. Hope Ave. to W. Marion St. 1 ST211220143 N. 50th St. - W. Luscher Ave. to W. Fairmount Ave. 2 ST211220125 N. 53rd St. - W. Glendale Ave. to W. Hampton Ave. 3 ST211220224 N. 56th St. - W. Nash St. to W. Vienna Ave. 1 ST211220150 N. 56th St. - W. Parkway Dr. to W. Hampton Ave. 3 ST211210234 N. 61st St. - W. Capitol Dr. to W. Hope Ave. 2 ST211190146 N. 61st St. - W. Hope Ave. to W. Marion St. 1 ST211220167 N. 61st St. - W. Marion St. to W. Congress St. 1 ST211220183 N. 62nd St. - W. Fiebrantz Ave. to W. Hope Ave. 1 ST211210205 N. 63rd St. - W. Villard Ave. to W. Lawn Ave. 3 ST211220184 N. 64th St. - W. Fiebrantz Ave. to W. Marion St. 2 ST211220212 N. 69th St. - W. Glendale Ave. to W. Courtland Ave. 1 ST211220175 N. 71st St. - W. Hampton Ave. to W. Stark St. 1 ST211220206 N. 72nd St. - W. Congress St. to W. Ruby Ave. 1 ST211220119 N. 78th St. - W. Silver Spring Dr. to W. Carmen Ave. 2 ST211220199 N. 92nd St. - W. Custer Ave. to W. Birch Ave. 1 ST211220201 N. 101st St. - W. Bender Rd. to W. Mill Rd. 1 ST211220166 W. Bender Ave. - N. 77th St. to N. 80th St. 2 ST211220162 W. Carmen Ave. - N. 27th St. to N. 29th St. 1 ST211220218 W. Carmen Ave. - N. 57th St. to N. 60th St. 2 ST211220213 W. Courtland Ave. - N. 69th St. to N. 70th St. 1 ST211220142 N. Darien St. - W. Cheyenne St. to W. Vera Ave. 1 ST211220123 W. Lancaster Ave. - N. 42nd St. to N. Sherman Blvd. 1 ST211220164 W. Luscher Ave. - N. 48th St. to N. 49th St. 1 ST211220234 W. Fairmount Ave. - N. Hopkins St. to N. Sherman Blvd 2 ST211220220 W. Silver Spring Dr. - N. 103rd St. to N. 107th St. 2 ST211220176 W. Stark St. - N. 60th St. to N. 61st St. 1 ST211220211 W. Tallmadge Pl. - N. 69th St. to W. Tallmadge Ct. 1 ST211220205 W. Thurston Ave. - N. 80th St. to N. 82nd Ct. 2 ST211220151 W. Thurston Ave. - N. 97th St. to N. 98th St. 1 Time for Completion: All work on this contract shall be completed by November 18, 2022. However, there may be some speed humps locations that have planned sewer and/or water utility work scheduled for this year. The completion date for those locations may be extended to July 1, 2023 or removed from this contract. Any additional locations added to this contract, shall be assigned completion dates as necessary to insure the timely completion of the contract. Liquidated Damages, per diem: $1000.00/Day The residency requirements for this project have been waived. This project includes American Rescue Plan Act (ARPA) funding. Bidders must review and abide by the Citys ARPA SWMBE Contract Compliance Procedures. The SMWBE/LSA requirement for this project is 7% of the contract base bid. The SMWBE/LSA Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. Smwbe Certificates Must Be Submitted With the Form a. Incomplete Smwbe /lsa Compliance Plans (Form a) or Inaccurate Compliance Plans Will Not Be Accepted and Will Render the Bid Unresponsive. For a Complete Listing of City of Milwaukee Certified Sbe Firms, See the Office of Equity and Inclusions (Oei) Electronically. If There Are Any Questions Regarding Sbe Firms, Please Contact the Oei at 414-286-5553. The State of Wisconsin Women Business Enterprise (Wbe) and Minority Busi- Ness Enterprise (Mbe) Directory Electronically. 1labor Surplus Area (Lsa) Information is Found Here: Electronically the Apprenticeship Requirements for This Project is: Zero (0) the Contractor Shall Specifically Note the Smwbe/lsa and Appren- Ticeship Forms for This Project. If the Forms Are Not Filled Out Properly, It Will Be Cause for Rejection of the Bid. Bid Security Required: Bond, Certified Check, Cashiers Check or Cash to Accompany Bid: 10% of the Contractors Base Bid. For Those Bids Being Submitted Through Bid Express and Using a Manual Bond, the Contractor May Send a Signed/executed Copy of the Bid Bond to the Department of Public Works Contract Office by Emailing Dpwbids@milwaukee.gov. The Emailed Copy of the Bond Must Be Received by No Later Than 10:30 a.m. On the Same Date That the Bids Are Due for That Specific Official Notice, or the Bid Will Be Considered Non-responsive. The Original Bid Bond Document Must Then Be Submitted by the Contractor to the Department of Public Works Contract Office in-person or by Mail to 841 N Broadway, Rm. 506, Milwaukee, Wi 53202, Immediately Upon Being Notified That They Are the Apparent Low Bidder. Important Notice: All Bid Documents for the Listed Project(S) Are Available Electronically or by Emailing Pdf Copies of the Complete Bid Documents to Dpwbids@milwaukee.gov. Call 414-286-3314 to Have Your Companys Name and Contact Information Added to the Plan Holders List. All bid documents for the listed project(s) are available electronically or by emailing PDF copies of the complete bid documents to DPWbids@milwaukee.gov. Call 414-286-3314 to have your companys name and contact information added to the plan holders list. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukees B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the Citys contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. The Prime Contractor awarded this project is required to participate in training on the City of Milwaukees LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
1,054
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

October 7, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.