BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construct asphalt concrete speed humps at the following locations: ST211210251 N. 11th St. - W. Concordia Av. to W. Keefe Ave. 2 ST211210260 N. 11th St. - W. Keefe Ave. to W. Finn Pl. 1 ST211220182 S. 12th St. - W. Lincoln Ave. to W. Grant St. 1 ST211160176 S. 14th St. - W. Edgerton Ave. to W. Vogel Ave. 1 ST211210261 N. 17th St. - W. Concordia Ave. to W. Keefe Ave. 2 ST211130159 N. 19th St. - W. Walnut St. to W. Vine St. 1 ST211220137 S. 19th St. - W. Hayes Ave. to W. Lincoln Ave. 1 ST211220138 S. 20th St. - W. Lapham St. to W. Orchard St. 1 ST211220226 N. 22nd St. - W. Vine St. to W. Brown St. 1 ST211220219 N. 23rd St. - W. Walnut St. to W. Vine St. 1 ST211210264 N. 23rd St. - W. Vienna Ave. to W. Melvina St. 1 ST211210111 S. 26th St. - W. Orchard St. to W. Greenfield Ave. 1 ST211220217 S. 26th St. - W. Pierce St. to W. National Ave. 1 ST211220154 N. 29th St. - W. Concordia Ave. to W. Townsend St. 1 ST211220196 N. 30th St. - W. Wright St. to W. Clarke St. 1 ST211220214 N. 46th St. - W. Chambers St. to W. Burleigh St. 1 ST211220197 N. 46th St. - W. North Ave. to W. Meinecke Ave. 1 ST211220190 N. 49th St. - W. Concordia Ave. to W. Townsend St. 1 ST211220153 N. 49th St. - W. Townsend St. to W. Keefe Ave. 1 ST211220195 N. 53rd St. - W. Clarke St. to W. Center St. 1 ST211220169 N. 58th St. - W. Wright St. to W. Clarke St. 1 ST211220181 N. Bremen St. - E. North Ave. to E. Meinecke Ave. 1 ST211220147 N. Buffum St. - E. Chambers St. to E. Burleigh St. 1 ST211220148 N. Buffum St. - E. Townsend St. to E. Keefe Ave. 1 ST211220207 W. Chambers St. - N. 11th St. to N. 11th La. 1 ST211220126 W. Chambers St. - N. 35th St. to N. 36th St. 1 ST211220187 W. Christine La. - N. Vel R. Phillips Ave. to N. 5th St. 1 ST211220160 E. Clarke St. - N. Palmer St. to N. 2nd St. 2 ST211220208 N. Dousman St. - E. Burleigh St. to E. Auer Ave. 1 ST211220157 E. Erie St. - N. Young St. to N. Jefferson St. 2 ST211220168 N. Grant Blvd. - W. Center St. to W. Hadley St. 1 ST211220161 E. Meinecke Ave. - N. Booth St. to N. Holton St. 1 ST211220185 E. Meinecke Ave. - N. Fratney St. to N. Pierce St. 1 ST211200150 W. Orchard St. - S. 26th St. to S. Layton Blvd. 1 ST211220186 N. Palmer St. - E. Brown St. to E. Lloyd St. 1 ST211220222 W. Pierce St. - S. Shea Ave. to S. 38th St. 5 ST211220171 N. Richards St. - E. Hadley St. to E. Locust St. 1 ST211220172 N. Richards St. - E. Townsend St. to E. Keefe Ave. 1 ST211220139 W. Scott St. - S. 10th St. to S. 11th St. 1 ST211200151 W. Scott St. - S. 14th St. to S. 15th Pl. 2 ST211220221 W. Warnimont Ave. - S. 61st St. to S. 63rd St. 2 ST211220180 N. Warren Ave. - N. Arlington Pl. to E. Brady St. 1 ST211220223 N. Terrace Ave. - N. Wahl Av. to E. Bradford Ave. 2 ST211220225 W. Valley Forge Dr. - N. 58th St. to N. 59th St. All work on this contract shall be completed by November 18, 2022. However, there may be some speed humps locations that have planned sewer and/or water utility work scheduled for this year. The completion date for those locations may be extended to July 1, 2023 or removed from this contract. Any additional locations added to this contract, shall be assigned completion dates as necessary to insure the timely completion of the contract. Liquidated Damages, per diem: $1000.00/Day The residency requirements for this project have been waived. This project includes American Rescue Plan Act (ARPA) funding. Bidders must review and abide by the City's ARPA SWMBE Contract Compliance Procedures. The SMWBE/LSA requirement for this project is 7% of the contract base bid. The SMWBE/LSA Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SMWBE certificates must be submitted with the Form A. Incomplete SMWBE /LSA Compliance Plans (Form A) or inaccurate Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) electronically. The apprenticeship requirements for this project is: Zero (0) The contractor shall specifically note the SMWBE/LSA and appren- ticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. Any required addenda or response related to listed projects will be posted on both the DPW and Call 414-286-3314 to have your company's name and contact infor- mation added to the plan holder's list. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process.

Award

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
67
Bidding Soon
1,075
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 7, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.