BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Kirkwood, Missouri. Contact the soliciting agency for additional information.

As of September 22, 2022. The project has been cancelled. Work by Contractor: Repair of Roadway, Driveway, Sidewalk and Other Surfaces from Water Main Breaks 1) Sawcut and excavate temporary pavement patch to pavement subgrade. 2) Prepare and compact granular base 3) Restore pavement, curbs, sidewalk, etc. according standard specifications 4) Remove forms, backfill, seed and straw as necessary Public Sidewalk Repair Program 1) Remove existing sidewalk slabs 2) Remove any roots by pruning, leaving a clean cut 3) Prepare a base 2" thick of 1" minus , crushed stone 4) Place new concrete sidewalk 5) Remove forms, backfill, seed and straw The City of Kirkwood will award to the lowest responsive and responsible bidder. South of Kirkwood, as noted in the attached map, is the territory south of Adams Road and Sugar Creek Road. Historic information, available to the City, shows this area has contained approximately 52% of the City's Water Department's repair projects and 54% of the City's street and sidewalk repair projects over the last year. The initial term of the contract shall be firm fixed pricing for 12 months. Upon expiration of the initial contract period, the City shall have the option to renew, one (1) term at a time, pending approval of funding, for up to four (4) additional 12 month terms through written mutual agreement between the City and Contractor. Acceptance of annual contract renewal periods is at the discretion of the City. Upon the City's issuance of a notice to proceed, the Contractor shall have no more than 30 calendar days in which to complete the entire project list provided, including all restoration. Contractor will not be provided any additional projects until all projects are completed. If Contractor is unable to complete the project within the 30 calendar days as provided in this section, including any time provided for inclement weather as defined in the terms and conditions, the amount of liquidated damages to be recovered shall be One Hundred Dollars ($100) per calendar day, the Contractor will be considered in default of the contract resulting in a 30 calendar day cure period in which Contractor shall complete the remaining work from the project list, and the Contractor will not receive additional work until their project list is complete. If Contractor fails to complete all work provided in the contract list within 60 calendar days or if the contractor exceeds the 30 calendar days provided in this section for a project list, including any time provided for inclement weather as defined in the terms and conditions, three (3) times within one (1) contract term, the City will have immediate grounds to terminate the contract.

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
39
Bidding Soon
794
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

March 22, 2023

img_map_placeholder

Multiple Locations, Kirkwood, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.