EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Harrisburg, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of December 1, 2022, the project has been awarded. A timeline for construction has not been confirmed. Contract No. 2022-15: Excavation - The Work for this Contract includes, but is not limited to, approximately 858 linear feet of 10-inch through 36-inch sewer pipe installation; replacement of nine (9) sewer manholes; installation of three (3) sewer manholes; abandonment of five (5) sewer manholes; replacement of 21 storm sewer inlets; removal of two (2) storm water inlets; replacement of three (3) storm sewer inlet tops; repointing of three (3) existing brick storm sewer inlets; installation of two (2) ADA ramps; restoration; and all other work identified in the Contract Documents. The Work is geographically located at multiple sites within the City of Harrisburg. The Work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents. Contract No. 2022-16: Trenchless - The Work for this Contract includes, but is not limited to, approximately 9,866 linear feet of cured-in-place (CIPP) lining of 8-inch through 36-inch diameter sewer main; removal of 71 intruding laterals; CIPP lining lateral reinstatement of 258 sewer laterals; 70 linear feet of geopolymer lining of 36-inch diameter sewer main; rehabilitation of 29 sewer manholes; restoration; and all other work identified in the Contract Documents. The Work is geographically located at multiple sites within the City of Harrisburg. The Work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents. Notice is hereby given that Capital Region Water has adopted the Minority Women and Disadvantaged Business Enterprise Plan to ensure that minority, women and other disadvantaged business enterprises have an equal opportunity to receive and participate in all project related construction contracts. Following the submission of DBE documentation in compliance with EPA Regulations regarding initial solicitations, it is the intent of Capital Region Water to ensure nondiscrimination in the award and administration of contracts, to create a level playing field on which minority, women, veteran, service-disabled-veteran, and LGBT-owned business enterprises can compete fairly for Capital Region Water contracts and subcontracts, to help remove barriers to the participation of minority, women, veteran, service-disabled veteran, and LGBT-owned business enterprises and to assist the development of firms that can compete successfully in the marketplace outside of this program. CRW will establish minimum participation levels (MPLs) for the MBEs, WBEs and other DBEs on a project-by-project basis. Notice is given that the project for which construction bids are being solicited hereby is a project constituting public works. The Contract Documents specify Davis Bacon wage rate requirements for the Project and are attached to the Bidding Documents. The wage rates will also be posted in a conspicuous location, visible to all of the contractors' employees. Each Bid shall be accompanied by a certified check or Bid Bond payable to "CAPITAL REGION WATER" in an amount of not less than ten percent (10%) of the total Bid Price in accordance with the provisions in the Instructions to Bidders. Capital Region Water reserves the right to reject any and all Bids, to waive any defects, errors, omissions, irregularities, or informalities in a bid or the bid procedure, and to accept any Bid deemed to be favorable to its interests. CLARIFICATION DEADLINE 9/29/2022 12:00 PM *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,896,875.00

Public - City

Paving, Site Work

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 09 - Finishes

Division 09 - Finishes

Flooring
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Meters
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
98
Bidding Soon
1,402
All Active Projects
638
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 3, 2022

img_map_placeholder

Multiple Locations, Harrisburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Sewer System Improvements Project - Excavation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.