BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a mixed-use development in Alexandria, Minnesota. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

Rainbow Rider Transit, a public transportation company is seeking bids for design for a new 20 stall garage, office and meeting facility. The contact person for all communication involving the RFP is: Tom Partington Rainbow Rider Transit Operation Manager tpartington@rainbowriderbus.com 800-450-7770 #216 Proposal evaluation will occur between September 26, 2022 and September 27, 2022. RRT reserves the right to review the proposals at a later date if necessary to allow for further consideration and proposer presentations prior to taking action. Other RRT personnel are not allowed to discuss the RFP with anyone, including potential proposers, before the RFP submission deadline. Submit all communications by email to the contact listed above. If any proposer attempts any unauthorized communication, RRT, in its sole discretion, may reject that proposer's proposal. The FTA is or will be providing federal assistance for this project in an estimated expected amount of $3,766,889.60; the Catalog of Federal Domestic Assistance (CFDA) number is 20.526. The DBE goal for this project is RGN. To be eligible for award of this contract, the responder must demonstrate that the responder has (1} obtained sufficient DBE participation to meet the DBE goal or (2) made adequate good faith efforts (GFE) to meet the DBE goal. The responder must submit the information specified in Table A in the time specified in Table B. If the contract has a specific numerical DBE participation goal, all responders must include their DBE commitment for the contract at the time the proposal is submitted. If the responder does not properly document the responder's efforts or submit timely and complete documentation to MnDOT OCR, MnDOT must reject the proposer's proposal. The method of contractor selection has not been determined at this time.

Conceptual

Service Station / Car Wash

$3,766,889.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
27
Bidding Soon
441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

Project location map

1919 W Winona Rd SW, Alexandria, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.