BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and remodeling of a mixed-use development in Edwardsville, Kansas. Completed plans call for the construction of a fire / police facility; for the remodel of a fire / police facility; and for site work for a fire / police facility.

The selected firm or individual will serve as the Citys Construction Manager (CM) and assist in three separate phases. A. Phase I Evaluation of Options The CM will assist the City in determining a scope of work for future phases. The City has identified different options based on the 2017 facility study. Options include, but are not limited to, the following: 1. Construct a new police, fire and administration building on vacant property adjacent to existing facilities. 2. Construct a new police and fire facility on vacant property adjacent to existing facilities and remodel/expand existing fire station for administrative offices. 3. Remodel/expand existing fire station for fire department use and construct a new police and administration facility on vacant property adjacent to existing facilities. 4. Construct separate facilities on vacant property adjacent to existing facilities or at other locations to be determined. 5. Some combination of the above choices. Additionally, the City has determined a separate site will be developed for the Public Works and Parks Maintenance facility. Public Works is currently located in a former EMS station that was constructed at the same time as the existing Fire Station. Consideration will be given to reuse of the building and/or site during the evaluation phase. In evaluating potential options, the CM will provide the City with pros and cons of each potential option along with a conceptual project budget. The budget should identify: 1. Construction costs anticipated by square foot (at midpoint of anticipated construction) 2. Furniture, fixtures and equipment 3. Professional fees (Architect/Engineer, Construction Management and other special consultants needed) 4. Testing services prior to and during construction. 5. Utility and connection fees including any relocations 6. Design contingency 7. Construction contingency 8. Other costs that will be attributed to the project. It is anticipated this phase will require at least three meetings with staff and elected officials as well as public presentations during one or more city council meetings. B. Phase II Selection of Architect Upon completion of Phase I, the City will consider executing Phase II. Phase II encompasses the selection of an architectural firm to develop plans in conjunction with the CM for the option(s) selected in Phase I. The CM will assist staff with the development of a Request for Qualifications (RFQ) for Architectural Services, the issuance of the RFQ, the evaluation of the RFQ responses and negotiations of a contract with the selected firm. It is anticipated this phase will require at least three meetings with staff and elected officials and attendance at one city council meeting. C. Phase III - Construction The CM will coordinate, oversee and deliver the facility(ies) as determined by a Construction Management Agreement.

Post-Bid

Fire / Police

$570,000.00

Public - City

New Construction, Remodeling, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
72
Bidding Soon
1,312
All Active Projects
511
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2022

January 23, 2023

img_map_placeholder

Multiple Locations, Edwardsville, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.