BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, outdoor lighting and new construction of a playground / park / athletic field in Snellville, Georgia. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

This work generally entails the construction of a new signature park pavilion, which will accommodate small bands and performances. This project is part of a much larger development, which is currently under construction, and will require close coordination with all on-site contractors. The project shall be Substantially Complete within six (6) months 180 calendar days from the date of notice to proceed. Liquidated damages of $150 per day will be assessed for each and every consecutive calendar day for which the completion of the project is delayed beyond the project schedule, except for quantifiable weather events. Bonding Requirements: 1. A 5% bid bond is required. 2. A Performance Bond (100%) and Labor & Material Payment Bond (110%) will be required on this project. Work to Be Performed: The pavilion is an open-air structure with a three-tiered roof. Work to be performed by the General Contractor consists of, but is not limited to, the following items: 1. Steel superstructure and framing. 2. Roof consisting of tongue and groove decking with composite cedar shake shingles. 3. Foundations including concrete footings with a concrete slab floor and concrete steps. 4. Pavilion lighting systems including both line and low voltage for spot lights, wall wash lights, stage lights and festoon lights with dimmer controls. 5. Power requirements including six outdoor GFCI quad outlets (twelve dedicated circuits). Supply power will be stubbed up by others. 6. Minor landscaping and site work. All questions regarding the bid documents shall be made via email to Matthew Pepper, Assistant City Manager at mpepper@snellville.org. The deadline to submit questions is no later than 2:00 PM EST, Wednesday, October 26, 2022. The City will post all "Responses to Questions and/or Addenda", if applicable, on the city web site by no later than 2:00 PM EST, Friday, October 28, 2022. It is incumbent that those submitting questions follow-up with the Assistant City Manager to ensure that questions were received.

Award

Playgrounds / Parks / Athletic Fields

$658,720.00

Public - City

New Construction, Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
157
Bidding Soon
2,203
All Active Projects
1,034
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 2, 2022

December 2, 2022

May 31, 2023

img_map_placeholder

2500 Thomas Snell Way, Snellville, GA, Snellville, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.