Renovation of a detention facility in Albany, New York. Completed plans call for the renovation of a detention facility.

The Albany County Correctional Facility needs to replace the main lobby flooring with a new resinous flooring system as per the bid specifications. 1. The contractor will remove and install existing flooring in main lobby and replace with new Resinous flooring system approximated at 2,500SF. All necessary components to successfully replace all work shall be performed in accordance with all applicable building codes, standards and materials specifications. Contractor will also supply all necessary components needed to rip out existing v.c.t and install new Dur-A-Flex Hybri-Flex Resinous flooring system. 2. The contractor shall install and provide all materials and labor to complete the following: a. Rip out existing vinyl composite tile and remove all existing cove base. b. Prep floor by diamond grinding leftover adhesive from previous v.c.t flooring. c. Vacuum all debris and properly clean and profile concrete substrate. d. Repair any minor surface deviations as well as seal surface joints with appropriate fillers/solid epoxy. e. Install new Dur-A-Flex Hybri-Flex Resinous flooring system by section to ensure proper function of main lobby. f. Install 100% solids integral epoxy mortar cove base where existing cove base was removed. g. Contractor must be willing to work off hours to provide safe work environment for staff/civilians as stated below. (3) h. Clean up and remove all debris on a daily/nightly basis. 3. The contactor shall coordinate access to job site and all work activities with the Superintendent /designee. All work shall be performed during the hours of 7AM - 5PM, unless otherwise agreed upon by the Superintendent/designee. Weekend work is available as well as overnight work as agreed upon by contractor and superintendent to ensure safety of staff as well as proper operation of main entrance. Time schedule for removal and SPC2 installation of new equipment must ensure uninterrupted operation of the maintenance department. 4. The successful contractor shall field verify all dimensions PRIOR to commencing work. 5. Contractor shall comply with all necessary OSHA regulations and standards. 6. Contractor shall clean all work areas each day to the satisfaction of the Superintendent/designee. Contractor shall remove and legally dispose of all construction debris. Contractor shall keep all areas of the work site free from rubbish and accumulation of waste materials 7. Contractor shall protect existing systems and surfaces to remain, all damage resulting from contractor's operations shall be replaced or repaired to a condition acceptable to the County Engineer, by the contractor at no additional cost to the County. 8. Contractor shall be responsible for all site staging and safety operations, as well as complete restoration of any disturbed areas of the main entrance/lobby to the satisfaction of the Superintendent/ designee. 9. Incorrectly fabricated, damaged or otherwise miss fitting or non-conforming material or conditions shall be reported to the Superintendent/designee prior to remedial or corrective action. Any such action shall require approval. 10. Contractor shall provide warranty to cover contractor workmanship for a minimum of 90 days from date of final completion of work. 11. Contractor shall provide manufacturer's standard warranty for materials. Warranty shall take effect upon final approval of work by Albany County. 12. Contractor shall physically inspect and evaluate installation of all equipment installed. Upon review of inspection, any recommendations outside this scope of services shall be submitted in writing to the County for review and approval prior to commencing work. General Requirements - Insurance Required - Prevailing Wage Required Delivery Point N/A Question Acceptance Deadline 09/12/2022 02:00 PM EDT There will be no bid security requested for this bid. No Performance bond is requested for this bid.

Bid Results

Jails / Prisons

$56,900.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
91
Bidding Soon
1,377
All Active Projects
647
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 14, 2022

img_map_placeholder

840 Albany Shaker Rd, Albany, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.