BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint Marys, Ohio. Completed plans call for site work for a water / sewer project.

Grand Lake West Bank Rear Docks Request To Purchase 1166 Removal and installation of West Bank Rear Docks and their accessories to specified details Supplier to install the following at Grand Lake St. Mary's State Park West Bank Rear Docks Mobilization and Installation of Wooden/Steel Docking Structures Launch Ramps Removal and Disposal of Existing Wood Piers (approximately 1,230 SF Total) Leave/Utilize Existing Pier Posts and Brackets, Fingers and Posts Adjust Existing Brackets if possible Install Qty of 17 Steel I Beams (W6 X 20 20') Construct Qty of 17 sets of Pier Brackets Construct Qty of 5 48" X 24' Piers labor Materials include Qty 280 Linear Feet (2 X 10 Ledge UB4 Material) Qty 600 Linear Feet (2 X 6 joists UB4 Material) Qty 840 Linear Feet (2 X 6 UB4 Material for Decking) Qty 25 Pounds Deck Screws Qty 20 Zinc Bolts Construct Qty of 5 (30 Inch x 20 Foot Pier UB4 Material) and install with composite decking Construct Qty of 1 (48 Inch x 10 Foot Ramp with Handrail) and install Qty 20 Boat Ties Shipping of Materials to be included Any Necessary Permits to be included Sales Tax Exempt All equipment needs to be included Clean and Dispose of All Debris and Removed Piers Work will be completed 90 days after Purchase Order is awarded, weather permitting. PWC RFQ Grand lake West Bank Rear Docks Inquiry End Date 9/27/2022 2:00:00 PM Completion/Delivery Date: Required delivery prior to December 31, 2022

Bid Results

Water / Sewer

$59,100.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
45
Bidding Soon
1,042
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2022

November 3, 2022

img_map_placeholder

834 Edgewater Dr, Saint Marys, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.