Renovation of a fitness / recreation center in Maquoketa, Iowa. Completed plans call for the renovation of a fitness / recreation center.

Painting will be of the following areas with the noted paint colors: 1. Main Lobby 1.2 Paint wall behind reception desk PNT-T 1.2.1 Sherwin Williams: Match Brand standard 1.2.1.1 C100 I M65 I YO I KO, R0 I G96 I B175, #0060af, PMS 661c 1.3 Paint walls in lobby PNT-1 1.3.1 Sherwin Williams: Alabaster 7008 2. Multipurpose Room 2.2 Paint gypsum walls PNT-1 2.2.1 Sherwin Williams: Alabaster 7008 3. Main Corridor 3.3 Paint walls in corridor PNT-1 3.3.1 Corridor walls : Sherwin Williams Alabaster 7008 3.4 Paint curved soffit and walls by water fountain PNT- N 3.4.1 Sherwin Williams: Match Brand standard 3.4.1.1 C100 I M65 I YO I KO, R0 I G96 I B175, #0060af, PMS 661c 4. Restrooms - Mens, Womens, and Special Needs 4.1 Paint walls in restrooms PNT-1 4.1.1 Special Needs - Sherwin Williams: Alabaster 7008 4.1.2 Touch up mens and womens lockerrooms as needed; Paint mural of a man and woman by each restroom entrance (4) 5. Stairs 5.2 Paint stair railing, step kick plates, wire mesh on stairs PNT-G 5.2.1 Sherwin Williams :Dorian Gray 6. Gymnasium 6.1 Paint walls up through maroon stripe PNT-1 6.1.1 Sherwin Williams: Alabaster 7008 6.2 Clean and touch up both white and blue ducts as needed 6.5 Clean acoustic wall panels per Manufacturer recommendations. 7. Wellness 7.2 Paint walls PNT-1 7.2.1 Sherwin Williams Alabaster 7008 7.4 Clean and touch up white and blue ducts as needed 7.6 Clean exposed ceiling 8. Pool/Natatorium 8.1 Paint walls PNT-1 8.1.1 Sherwin Williams Alabaster 7008 8.2 Paint return to match existing paint 8.3 Clean acoustical wall panels as recommended by Manufacturer; spray touch up as needed 9. Throughout entirety of the facility 9.1 Paint all doors and door frames and wire mesh PNT-G 9.1.1 Sherwin Williams :Dorian Gray 10. Rust (As Needed) 10.1 Treat rust spots as needed with rust inhibitor The City of Maquoketa is seeking bids to repaint the interior of the facility at The Maquoketa Area Family YMCA, a city owned, YMCA IMV managed recreational center. Bidders need to schedule a time to visit the YMCA personally prior to submitting a bid. Contact Scott Warren via email at swarren@maqymca. Required bonds: Please be advised that your quote must include the cost of Performance and Payment bonds that will need to be in effect while the work is being completed. However, you do not have to actually obtain such bonds as a condition for submitting a quote. Upon the award of a contract, but before the "notice to proceed" is issued, the successful bidder must provide these bonds in a form that is acceptable to the City. The successful bidder is advised not to incur any project costs until bonds have been approved.org or by phone at 563-652-6566. Work start date: Monday, April 3rd, 2023 Selection of Bidder & Contract Award: Monday, October 3 rd 2022 OSHA: Contractor and all employees shall abide by all OSHA (Occupational Safety and Health Administration) regulations, and the City and/or the YMCA IMV reserves the right to stop all work if property safety practices are not in use Selection Criteria Staff of The City of Maquoketa and The Maquoketa Area Family YMCA will review submitted proposals and select the contractor based upon (in order of priority): Ability to complete work in the allotted time o Cost o Quality of work / Work history o Expertise and experience The City of Maquoketa and The Maquoketa Area Family YMCA are equal opportunity employers. Insurance: During the term of the project, the Contractor shall maintain, at their sole expense, the following insurance policies. Even if the City and the YMCA IMV have an insurance certification on file, all bids MUST be accompanied with a copy of: 1. The bidder's certificate of liability insurance with a minimum of $1 million for each occurrence and a general aggregate of $2 million 2. Worker's Compensation as required by the laws of Iowa. The City must be given an insurance certificate that names the City and the YMCA IMV as additional insured prior to the contractor's commencement of the project. 3. Comprehensive general liability and property damage with a combined single limit of not less than $1 million per each occurrence. The City must be given an insurance certificate that names the City and the YMCA IMV as additional insured prior to the contractor's commencement of the project. 4. Auto liability and property damage, including hired, rented, owner and non-owned automobiles and vehicles with a combined single limit per each occurrence of $1 million for bodily injury and property damage.

Award

Fitness / Rec Centers

$90,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
63
Bidding Soon
1,283
All Active Projects
467
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2022

April 3, 2023

img_map_placeholder

500 E Summit St, Maquoketa, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.