BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cincinnati, Ohio. Completed plans call for site work for a water / sewer project.

For furnishing all materials, labor, and equipment and performing all work necessary to Furnish and Install Ductile Iron Pipe and Fittings, Copper Pipe and Fittings, and other work necessary or incidental to the installation of the proposed water main. Questions or requests for additional information regarding this solicitation shall be directed in writing to the assigned City of Cincinnati Buyer, Melanie Roaden, via email at melanie.roaden@cincinnati-oh.gov. Please submit questions via email by 12:00 PM ET on September 14, 2022. Unless waived under the conditions stated, all bids must be accompanied by a bid bond, deposit of cash, or certified check, bank cashier's or bank official's check, drawn on a solvent bank, payable to the Treasurer of the City of Cincinnati in the amount determined by the City as stated in the legal advertisement (see cover page), as a guarantee that, if the bid is accepted, a contract will be entered into. The City will determine the sufficiency of the surety. The bid bond should be executed by an authorized surety, guaranty or trust company. The successful bidder will be required to furnish a bond or certified check on a solvent bank, payable to the Treasurer of the City of Cincinnati, in the amount stated herein as a guarantee for the faithful performance of the contract. The City will determine the sufficiency of the surety. Partial payments may be made upon presentation of a properly executed invoice unless otherwise stated in the Bid Document. The final payment will be made by the City when the materials, supplies or equipment has been fully delivered and accepted or the work completed to the full satisfaction of the City The contractor shall secure delivery of all equipment and materials required and shall complete on site work within 150 calendar days from receipt of notice to begin work. The amount of liquidated damages to be paid by the contractor for each and every working day that he is in default is $1,000.

Award

Water / Sewer

$1,520,165.00

Public - City

Site Work

18

3

6

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
1,306
All Active Projects
575
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.