Published November 1, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Brockway, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of November 1, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Without intending to limit or restrict the volume of Work required, the Project includes the following Work: Construct water main replacements in and around Pershing Avenue, Brockway Borough, Jefferson County, including a 500 L.F. directionally drilled levee and stream crossing, approximately 450 L.F. of connecting water main (open material choice), pressure grouting abandonment of portions of existing water mains and valve boxes, appurtenances and restoration. Construct water main replacements in and around Rattlesnake Road, Snyder Township, Jefferson County, including a 300 L.F. directionally drilled wetland and stream crossing, a 90 L.F. directionally drilled highway crossing, approximately 100 L.F. of connecting water main (open material choice), appurtenances and restoration. Bids will be reviewed at the Authoritys monthly meeting on Monday, October 10, 2022, at 7:00 P.M. prevailing time. No bid will be considered unless it is accompanied by a certified check or Bid Bond in an amount equal to ten percent (10%) of the total bid. The Bid Security shall be made payable to Brockway Borough Municipal Authority. All Bid Bonds must be accompanied by a Power of Attorney or suitable letter of commitment from a licensed surety company as described in the Instructions to Bidders and Specifications. CLARIFICATION DEADLINE 9/30/2022 2:00 PM Except as permitted by law, the Owner shall Award the Contract to the Lowest Responsible Bidder or reject all Bids within sixty (60) days from the date of Bid opening; and no bidder may withdraw his Bid before the expiration of such 60-day period; provided however that if the Award is delayed by the required approval of another Government agency, the sale of bonds, the award of a grant or grants, the Owner shall reject all Bids or Award the Contract to the Lowest Responsible Bidder within one hundred twenty (120) days from the date of Bid opening, and no bidder may withdraw his Bid prior to the expiration of such 120-day period. Thirty (30) day extensions of the date for the Award may be made by the mutual written consent of the owner and the Lowest Responsible Bidder. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The Owner reserves the right to reject any or all bids, or portion thereof, and to waive any informalities and to accept any bid that it may deem to be in the best interest of the Authority.

Bid Results

Water / Sewer

$782,285.00

Public - City

Site Work

24

14

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Concrete Raising, Pressure Grouting, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
91
Bidding Soon
864
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

November 4, 2022

img_map_placeholder

Multiple Locations, Brockway, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Stream Crossings Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.