BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Hayward, California. Completed plans call for the renovation of a water / sewer project.

Digester Gas Treatment System Media Replacement at Water Pollution Control Facility Any administrative questions regarding bidding procedures should be directed to the Purchasing Manager, Rita Perez at (510) 583-4801; email: rita.perez@hayward-ca.gov Questions relating to the project management may be directed to David Donovan at (510) 293-5099; email: david.donovan@hayward-ca.gov. The successful bidder, simultaneously with the execution of the agreement, shall furnish a payment bond in the amount of 100% of the contract price and a faithful performance bond in the amount of 100% of the contract price. Bonds secured from a surety company issued by corporation duly and legally licensed to transact business in the State of California and approved by the City. Bid bond is not required for this project. Bid proposal may be withdrawn by the bidder prior to the time fixed for the opening of bids, but may not be withdrawn for a period of ninety (90) days after the opening of bids. A successful bidder shall not be relieved of the bid submitted without the City's consent or bidder's recourse to Public Contract Code sections 5100 et. seq. The City reserves the right to reject any and all bid proposals, to contract work with whomever and in whatever manner the City decides, to abandon the work entirely and to waive any informality or non-substantive irregularity as the interest of the City may require and to be the sole judge of the equipment offered. Prevailing wages must be paid to all workers employed on a public works project when the public works project is over $1,000. Prevailing Wages: The Work is subject to the payment of not less than prevailing wages under Labor Code Section 1770 et seq. Bidders are hereby notified that the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages and the rates for overtime and holiday work in the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the Work under the contract which will be awarded to the successful bidder. Should the Contractor fail to complete this contract, and the work provided herein within the times fixed for such completion, due allowance being made for contingencies provided for herein, the Contractor shall become liable to the City for all loss and damage which the latter may suffer of account thereof. As it is difficult to ascertain and determine the actual damage which the City will sustain in the event of any, by reason of such delay; and it is therefore agreed that said Contractor will pay to the City the sum of three hundred dollars ($300.00) per day for each and every calendar days delay beyond the time herein prescribed in furnishing the said work as liquidated damages; the said Contractor agrees to pay said liquidated damages as herein provided, and in case the same is not paid, agrees that said City may deduct the amount thereof from any money due or that may become due said Contractor under this Contract, and should such money be insufficient to cover such damages, the City shall have the right to recover the balance from the Contractor or his/her Surety. In addition to the above stipulated liquidated damages, the Contractor shall pay the cost of the Inspector's salary for the time the Inspector is required on the project beyond the allotted contract time. Payment for Inspector's salary to be made directly to the City. The City shall determine the time the Inspector is required on the Project. The City reserves the right to accept or reject any and all bids or any portion or combination thereof, or award on the basis of the total bid. The City of Hayward reserves the right to reject any and all bids, or to waive any informality or non-substantial irregularity in any bid.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
89
Bidding Soon
1,862
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

img_map_placeholder

To Be Determined, Hayward, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.