BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Herrin, Illinois. Completed plans call for the renovation of a residential development.

IL-50-6/Herrin, IL-50-19/Herrin, IL-50-20/Johnston City, IL-50-21/Cambria, IL-50-22/Hurst, IL-50-23/Crainville, and IL-50-24/Energy IL-50-6/Herrin Work in dwelling units includes abatement of floor tile and mastic and designated areas of gypsum board wall finishes. Remove and replace all existing water heaters, appliances, and other floor mounted equipment for flooring work. New LVP and base trim. Replace existing dryer vents/caps. Saw-cut, remove, and replace concrete floor slab as required for access to underslab sanitary waste piping. Replace all underslab sanitary waste piping. Replace interior doors, frames, and hardware. Replace shelving. Replace all light fixtures and wiring devices. Replace existing electrical load centers and service wires back to meter bases. Upgrade or convert designated units to meet accessibility codes and standards. Remove existing boilers including fin tube heaters, covers, flues, etc. Install new electric baseboard heaters throughout. Bathroom work shall consists of removing and replacing gypsum board wall finishes. Replace water closets, wood chair rails, toilet accessories, medicine cabinets, light fixtures, exhaust fans, receptacles, and switches. Replace tubs and surrounds. Replace existing lavatories with vanity cabinets and tops. Provide step-in or roll-in showers at designated units. Kitchen work consists of removing and replacing existing kitchen cabinets, countertops, sinks, range hoods, and grease shields. Install new HPDL wall finish. Site work includes removing and replacing designated concrete walks and paving. Regrade yard areas and place new concrete walks and paving. Site utilities include replacing site electrical feeders, transformers, etc. with underground service. IL-50-19, IL-50-20, IL-50-21, IL-50-22, IL-50-23, and IL-50-24 Work consists of converting designated units to meet sight and hearing impaired requirements.

Award

Residential Subdivision

$2,230,000.00

Public - County

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
37
Bidding Soon
592
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2022

November 30, 2022

img_map_placeholder

Multiple Locations, Herrin, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.