Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 14, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a mixed-use development in Sugar Grove, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of October 14, 2022, project was awarded to O’Donnell Construction, awarded amount is $134,502.85. Sugar Grove Fire Protection District is accepting bids for the proposed parking lot improvements at the Fire Station 1 site located at 25 Municipal Drive in Sugar Grove, Illinois. Work includes the sawcutting of existing pavement, removal of concrete and asphalt pavement on the west side of the fire station as detailed in the Civil Engineering Site Plans. Contractor shall install new downspout drain lines and pavement under-drain lines as detailed in the plans, fine grade and compact the existing stone subgrade and install new concrete and asphalt pavement. Parking spaces shall be re-striped. Sugar Grove Fire Protection District reserves the right to reject any or all proposals, to waive or not to waive any informalities therein or to accept the proposal considered to be in the best interest of the Sugar Grove Fire Protection District . The fire district wants all work to be completed this year. All work shall be completed before the asphalt plants close or by November 18, 2022, which ever date is the earliest. STORM SEWER 4" PERF SDR26 W/SOCK SET IN GRAVEL TRENCH 6" PERF SDR26 W/SOCK SET IN GRAVEL TRENCH 6" PVC SDR26 PIPE 8" PVC SDR26 PIPE PIPE FITTINGS & TEE'S RIP-RAP & FILTER FABRIC UNDERLAY ROADWAY SAW CUTS COMBINATION CONC. B6-12 CURB & GUTTER HMA IL-19, N50 2" SURFACE COURSE HMA IL-19, N50 2 1/2" BINDER COURSE HMA IL-19, N50 6" BINDER COURSE 8" P.C.C. PAVEMENT GENERAL PAVEMENT REMOVAL CONCRETE REMOVAL CURB REMOVAL PARKING LOT STRIPING RESTORATION & SEEDING
Award
Sidewalks / Parking Lot
$134,503.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2022
November 11, 2022
25 Municipal Dr, Sugar Grove, IL
Related To This Project
Sugar Grove, IL
Bid Date: Sep 22 2022
Sugar Grove, IL
Bid Date: Dec 14 2022
Sugar Grove, IL
Bid Date: Jan 19 2023
Sugar Grove, IL
Bid Date: Jan 20 2023
Sugar Grove, IL
Bid Date: Apr 01 2022
Sugar Grove, IL
Bid Date: Apr 14 2022
Sugar Grove, IL
Bid Date: Apr 06 2022
Sugar Grove, IL
Bid Date: Apr 08 2022
Sugar Grove, IL
Bid Date: Nov 18 2022
Palatine, IL
Bid Date: Sep 13 2022
North Chicago, IL
Bid Date: Oct 07 2022
Downers Grove, IL
Bid Date: Oct 06 2022
Danville, IL
Bid Date: Jan 11 2023
Aledo, IL
Bid Date: Oct 31 2022
Elk Grove Village, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
