BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in New York, New York. Completed plans call for the renovation of a residential development.

This is an RFQ (request for quotes). This is not an IFB (bid). The Bernard Fineson DDSOO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate relevant experience on prior projects of similar magnitude. The Bernard Fineson DDSOO reserves the right to reject any and all quotes. In deciding whether to or not to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Workers Compensation Insurance as well as completed Lobbying Law Forms, and Signed Appendix A. Please be prepared to submit these in a timely fashion. The Bernard Fineson DDSOO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Bernard Fineson DDSOOs interpretation of specifications shall be final and binding. Please note all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitors log and/or an attendance sheet provided by the maintenance department. NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working. If this is a public work contract covered by Article 8 of the Labor Law or a building service contract covered by Article 9 thereof, neither Contractors employees nor the employees of its subcontractors may be required or permitted to work more than the number of hours or days stated in said statutes, except as otherwise provided in the Labor Law and as set forth in prevailing wage and supplement schedules issued by the State Labor Department. Furthermore, contractor must pay at least the prevailing wage rate and pay or provide the prevailing supplements, including the premium rates for overtime pay, as determined by the State Labor Department in accordance with the Labor Law. NYS law requires the vendor to keep detailed records for each person employed including name, address, telephone number, social security number, occupational classification in which worked, hourly wage rate paid, supplements provided, number of hours worked, and actual wages paid. Certified payroll record/s MUST be submitted at the time of invoicing. Effective April 28, 2008, if this is a public work contract covered by Article 8 of the Labor Law, the contractor understands and agrees that the filing of payrolls in a manner consistent with Subdivision 3-a of Section 220 of the Labor Law shall be a condition precedent to payment by the State of any State approved sums due and owing for work done upon the project. Without submittal of certified payroll record/s, payment will not be made. OPWDD does not allow subcontracting on this type of work. Be Sure to Include a Cost Breakdown and List Number With Your Quote. When Listing Your Materials Please Specify Brands, Measurements, and Any Other Necessary Details ADDRESS: Brooklyn DDSOO, Business Office, 750 Vandalia Avenue, Brooklyn, NY 11239 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Women Owned Sub-Contracting Goal: 7% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 30 days Replace bathroom as per scope of work. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of roof replacement, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. Please note, vendors must remain for the mandatory site visit in its entirety in order to ask questions regarding the specifications of this project. Leaving the site visit early will cause you to be ineligible to submit a quote. Any vendor questions not asked during the site visit must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov (within two business days of the site visit: September 22, 2022). Both questions and answers (if any) will be provided to all who attend the site visit via email by: September 30, 2022. The Bernard Fineson DDSOO Maintenance point of contact for this project is Phil Savours at (929) 232-9437 or via email at Phil.X.Savours@opwdd.ny.gov.

Bid Results

Residential Subdivision

$15,242.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
231
Bidding Soon
4,509
All Active Projects
2,077
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.