Published October 17, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in East Moline, Illinois. Completed plans call for the renovation of a educational facility.

Scope includes shoring of roof structure, removal of CMU walls, removal of corroded bar joist ends, welding in of new steel bar joist ends, reinstallation of CMU walls, new prefinished steel siding, new aluminum soffit, painting and related work. Documents will be available for downloading from Mimecast. Contractors are responsible for registration, fees, etc. for use of this site. It is solely the contractor's responsibility to verify that he is downloading all drawings, all specifications, and all addenda for this project. No additional cost will be allowed by the Owner for the contractor's failure to download all material. Contractors to request access to downloads by calling the Architect's Moline office or by emailing at jwojak@brayarch.com or mmiller@brayarch.com. Contractor will receive email notice and invitation to view project folder to download drawings, specifications, addenda, etc. Contract documents are made available only for the purposes of this Project. Their use does not grant a license for other purposes. Printed hard copies of the documents are available for purchase by the Contractor from: 1. Rapids Reproductions, Inc., 3875 Elmore Avenue, Suite C, Davenport, Iowa 52807 Phone: 563-445- 3081, ATTN: Mark Hoover. markh@rapidsrepro.com. 2. Contractor must call ahead to order sets of documents as this is a print-to-order project. The Owner reserves the right to accept Bidder's Base Bid, accept any one or more of the Bidder's Alternate Bid's, reject any or all Bids, award contract based on its investigation of the Bidder's, as well as acceptance of Alternates all of which the Owner deems to be in its best interest and waive any informalities or minor irregularities in the Bids and waive minor irregularities in the bidding procedure, all at the Owner's discretion. The Owner nor the Architect will be providing additional SETS of drawings for construction use. It is each Contractor and Sub-Contractor responsibility to review and obtain FULL SETS of construction documents and addendums for bidding and construction purposes. No additional sets of plans and specifications will be issued by the Owner or the Architect for construction. Any Contractor wishing to be added to the Plan Holders List that received or reviewed documents at any of the following plan exchanges must contact jwojak@brayarch.com A certified check, a cashier's check or a bid bond payable to the Owner in an amount not less than 5% of the maximum bid shall accompany each bid as a guarantee that if the bid is accepted, the Bidder will execute and file the proposed contract and bond within ten days after the award of contract. Prevailing Wage Rates: A. All Contractors must pay the Prevailing Wage Rates as established by the Illinois Department of Labor. Contractor shall submit with each payment request the weekly payroll forms required by the Davis-Bacon Act (40-U.S.C. 327 et seq. (1982)). Payroll form WH-347 or similar information. Payroll forms shall be submitted (one copy) for each person employed on the jobsite by each contractor and all subcontractors. Bidders shall bring discrepancies, omissions and conflicts of doubt as to true meaning of any part of the contract documents to the attention of Architect, Mark Miller at 309.517.5073 by Monday, September 26, 2022. Illinois Preference Act: A. All contractors, subcontractors, and those supplying labor to this project shall comply with the "Employment of Illinois Workers on Public Works Act" (30 ILCS 570/) commonly referred to as the Illinois Preference Act

Award

Educational

$117,830.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Siding, Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
67
Bidding Soon
724
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 10, 2022

img_map_placeholder

1275 Avenue of the Cities, East Moline, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

United Township High School - Pool Bar Joists Repairs

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.