BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fort Wayne, Indiana. Completed plans call for the renovation of a educational facility.

https://www.journalgazette.net/local/fort-wayne-community-schools-picks-construction-company-for-middle-school-renovation/article_a2ed584a-9ce6-11ed-af64-1b8d80d19829.html A Fort Wayne middle school renovation project now has a construction company on board. Fort Wayne Community Schools leaders agreed Monday to hire Weigand Construction Co. for the makeover of Blackhawk Middle School, which was built in 1972. The pre-construction services fee is $48,500. The Blackhawk project is among three major school renovations funded by the 2020 referendum. Elevatus Architecture was hired in October as project architect/engineer for $850,000. The final guaranteed maximum price for the work will be established later, but district staff have previously said the estimated construction budget is $17 million. Construction is anticipated to start in spring 2024 with completion eyed for fall 2025, said Darren Hess, facilities director. Other companies are handling work elsewhere in FWCS: o The board awarded Schenkel Construction a $462,530 contract addressing accessibility needs at eight elementary schools. The work - which includes renovation of preschool restrooms - will be supported by a grant and the district's operations fund. It is expected to be completed by Aug. 1. o All classroom teachers will get new, ergonomically designed chairs through an agreement with Seely Office Solutions. The $874,476 price includes more than the 2,700 chairs. It covers delivery, installation after regular school hours to each classroom, and removal and recycling of the old chairs not being reused or auctioned. Teachers will begin getting their new chairs in March on a building-by-building basis. o The board awarded Jace Electric with a $446,780 contract for work involving new interior and exterior lighting and lighting controls in seven buildings along with a generator replacement at the Bill C. Anthis Center. The upgrades are expected to be done by July 28 and will be funded through the district's operations fund. o Schenkel Construction will complete $345,925 in improvements at the Anthis Center by July 28. The project includes renovations to a classroom, the former cafe and the pre-K suite. It is supported by a combination of district funds and a grant. o Shawnee Construction and Engineering will handle numerous door, frame and hardware replacements to meet accessibility requirements throughout various buildings. The $381,725 project has a July 28 deadline and is supported by district funds and a grant. o The board awarded two contracts for masonry repairs at various locations. Agreements total $304,879 with Atlas Building Service and $294,463 with Hagerman Construction. The work will be completed by Aug. 6 and is funded by the 2016 referendum. o Current Mechanical will complete plumbing work by July 28 in eight buildings for $728,000. District funds and a grant will support it. ____________________________________________________________________________________________________________________________________ The Board of School Trustees reserves the right to reject any and all proposals. One complete set of downloaded bidding documents is available for no charge. Bidding documents may also be purchased per the options and pricing listed on the Order page (plus $19.95 Processing Fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required (before printing) for purchases. PLEASE NOTE - IF THE FREE SET DOWNLOAD IS THE ONLY ITEM YOU ORDER, please ignore the charges that appear and be sure to select No Deposit/No Charge as the Payment Method. If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
87
Bidding Soon
1,101
All Active Projects
408
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2022

August 15, 2023

img_map_placeholder

7200 E State Blvd, Fort Wayne, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.