BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2022 at 7:00 PM

Updated January 25, 2024

Site work, paving and outdoor lighting for a mixed-use development in Belle Glade, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Palm Beach Road Name: Sr-80/us-98 From East of Parker Ave to West of Washington Rd Limits: 93120000 Project(s): 44610115201(*) Federal Aid No: N/A Project(s): 44610115202 Federal Aid No: N/A Project(s): 44610125201 Federal Aid No: N/A Project(s): 44610125202 Federal Aid No: N/A Total Roadway Length: 1.930 Miles Contract Days: 148 Total Bridge Length: 0.222 Miles Total Proposal Length: 2.152 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 The Improvements under this Contract consist of, but are not limited to, asphaltic concrete (milling and resurfacing), concrete (removal, sidewalk), signing (panel removal, panel furnish and install), pavement markings (raised markers, object markers, delineators, painted, thermoplastic, bike lane), signalization (Pedestrian signals, conduit, cable, pull box), lighting (aluminum pole, conduit, cable, pull box), monitor existing structures (inspection and settlement, vibration), utility adjustments (manhole), Fencing (over Railroad), and Bridge Rehabilitation (Steel Beam Repairs, Spall Repairs, Steel Beam Painting, Class 5 Finish), along SR 80 from east of Parker Avenue to west of Washington Road for 0.732 miles, in the City of West Palm Beach, Palm Beach County. Pre-qualified: Contractor needs to be pre-qualified. Performance Bond : A Contract / Performance bond is required for this project. Commercial General Liability Insurance: The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy. The limits of coverage described herein shall apply fully to the work or operations performed under the Contract, and may not be shared with or diminished by claims unrelated to the contract. The policy/ies and coverage described herein may be subject to a deductible. Pay all deductibles as required by the policy. No policy/ies or coverage described herein may contain or be subject to a Retention or a Self-Insured Retention. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FDOT - Call Order: 008 - Resurfacing

Award

Bridges / Tunnels

$3,843,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

32

5

2

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
147
Bidding Soon
2,254
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

October 17, 2022

Project location map

US-98 & FL-80, Belle Glade, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.