BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Jones HS - Repair (2) Energy Recovery Units - Prequalified Various Trade Contractors Only Provide Labor and Materials: Repair (2) Venmar Units-ERU-8-1 & ERU-8-2 Model: W240iPPHWHP18012XP; Serial: 00681728-C05039 & 00681732-C05040 1) Mobilize site and check-in with facility staff. 2) Thoroughly inspect all circuits on ERU 1 & 2 for correct operating pressures, leaks and compressor malfunctions. 3) Supply and install new energy recovery wheel belts. 4) Supply and install temperature / Humidity sensors. 5) Supply and install duct static pressure sensors. 6) Leak Check the 3 refrigeration circuits on both 8-1 and 8-2 that are out of refrigerant. 7) Evacuate the circuits and charge with virgin refrigerant. 8) Supply and install a new controller on ERU 8-1 unit. 9) Start-Up and Test Equipment. 10) Contractor to secure necessary permits. 11) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 12) Not responsible for contractor errors as a result of non-field verification. 13) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 15854 - ENERGY RECOVERY AIR-HANDLING 14) Secure job site overnight if work is not completed in one day. 15) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 16) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 17) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 18) Contractor is to remove and dispose of materials torn out and any construction debris. 19) All trash must be removed off-site by contractor. 20) Clean the surrounding area and make sure all is swept of debris. 21) All questions/requests must be received two (2) business days prior to bid closing. 22) All work to be performed during normal business hours (7:00 am - 3:30 pm, Monday - Friday) Questions Due Date: Sep 26th 2022, 4:30 PM CDT

Post-Bid

Educational

$250,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
94
Bidding Soon
1,816
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2022

November 7, 2022

img_map_placeholder

700 S State St, Chicago, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.