BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2022 at 8:00 PM

Updated September 15, 2023

New construction and addition to a mixed-use development in Corp Christi, Texas. Conceptual plans call for the addition of a fire / police facility; and for the construction of a fire / police facility.

The 2022 Bond Proposition C calls for: Calallen Police Sub-Station (Design Only) Far South Police Sub-Station (Design Only) Fire Station 10 Replacement (Design Only) Fire Station 8 Replacement (Design Only) As of September 8, 2022, funding is pending bond approval. A bond vote has been scheduled to take place on November 8, 2022.

Conceptual

Fire / Police

$10,000,000.00

Public - City

Addition, New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
26
Bidding Soon
398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

Project location map

Multiple Locations, Corp Christi, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.