Site work and new construction of a civil project in Norfolk, Nebraska. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of December 15, 2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. The project is briefly described as follows: Select demolition activities at the existing treatment facility that include; pre-aeration basin, grit facilities and piping, and lift station equipment and piping, associated site concrete and/or structures, grating, stairs, associated piping, valves, and controls; miscellaneous mechanical/electrical equipment, and site modifications. Construction of a Grit building and grit equipment, rehabilitation of north lift station and primary clarifier #2. Work will require bypass pumping. Construction activities include providing all necessary materials, labor, equipment, and testing for the installation and/or construction of improvement to the following: 1. Select demolition activities at the existing treatment facility that include: removing existing grit basins (2), removing existing pre-aeration basins (3), and removing existing Parshall flume basin while retaining the two-story existing grit washer building, and removing existing silo; removal of pipes, pumps and appurtenances in the North Lift Station, partial removal of 20" and 30" force main piping from the existing North Lift Station to the existing grit removal building; and decommissioning of existing irrigation well per NDEE standards. 2. Construction Activities include providing all necessary materials, labor, equipment,and testing for the installation and/or construction of improvementsto the following: a. New precast grit building and overland waste receiving station including new grit removal equipment consisting of two stainless steel vortex units, two recessed impeller grit pumps, two grit washers with screw conveyor, flow meter, and any associated valves, piping, concrete, mechanical, controls, electrical, yard piping shown and connections to the North Lift Station and existing primary clarifiers. Includesrerouting of 6-inch waste activated sludge (WAS) line from existing pre-aeration basins to the intake structure for primary clarifiers #1 and #2, and bypass back to the head of the plant. New grit building will be integrated into existing SCADA system. Also includes construction of a new overland waste receiving station that will receive truckloads of wastewater that will be pumped to the grit washers for processing. b. Non-potable water system in the existing aeration control building including pumps, piping, hydropneumatic tank and controls, electrical connections, yard piping, yard hydrant. Will also include extension of and connection to the potable water system with all associated valves, backflow prevention controls and piping to serve as a backup if non-potable water is not available due to maintenance. The non-potable system will serve the grit washers in the new grit building, the new overland waste receiving station both for fluidizing the offloaded wastewater and a yard hydrant for washing the truck offloading area. A nonpotable line will be run to the North Lift Station for potential future use. c. Rehabilitation of the North Lift Station including replacement of all piping,appurtenances, pumps and electrical equipment inside the existing structure, rehabilitation of the mechanical systems for the North Lift Station building, and replacement of the east door. Work in the existing wetwell will require bypass piping. d. Primary Clarifier #2 rehabilitation including cleaning and recoating of the equipment mechanisms, and rebuilding drive unit. e. Plant SCADA system modifications and reconnections. f. Project work shall include all required spare parts as listed in the specifications. 3. SWPPP, Floodplain development, Fire Marshal, and other permitting implementation. 4. All work complete with bypass pumping ofselected processes, connectionsto existing structures, sidewalks or paved roadways, site grading, erosion control, seeding, yard piping, buried valves, architectural building modifications, mechanical/electrical/control components, demolition/modification, and other items of miscellaneous work which are either shown on the plans or in the Contract Documents to complete the Work

Final Planning

Water / Sewer

$6,881,143.00

Public - City

New Construction, Site Work

123

31

65

11

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
27
Bidding Soon
372
All Active Projects
177
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 19, 2022

June 15, 2023

February 1, 2025

img_map_placeholder

To Be Determined, Norfolk, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.