BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Wilmington, North Carolina. Conceptual plans call for the renovation of a water / sewer project.

Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of miscellaneous improvements to Richardson Water Treatment Plant. The Richardson Water Treatment Plant (RWTP) was built in 2008 and currently produces about 7 million gallons of drinking water per day (m g d). To meet increasing demand and continue to provide quality drinking water to approximately 30,000 people New Hanover County residents, operational improvements are needed. The project will generally consist of developing contract drawings and technical specifications for the operational improvements to the Richardson Water Treatment Plant. Project will also include obtaining necessary permits, assisting in the bidding process, and providing construction administration and observation-based services. SOQ's shall be limited to 20-pages or less, excluding cover page, table of contents, tabs, resumes and appendices. Firms shall submit their statement of qualifications for consideration in .pdf format to bids@cfpua.org. Maximum file size for .pdf submission is 25MB. A reply will be sent to the email address submitting the statement of qualifications to confirm receipt. It is the submitting firms' responsibility to confirm that CFPUA has received statement of qualifications via email. If email reply is not received from bids@cfpua.org, please call 910-332-6472 or 910-332-6589 before deadline for submission. Submitted information shall comply with N.C.G.S. 143-64.31 through 64.34 (akaMiniBrooks Act). All SOQ's will be evaluated by a CFPUA selection team One firm will be selected from this request for qualifications. Description of Services The scope of work is expected to include the services described below. No guarantee is expressed or implied by the CFPUA that all services will be performed or that the selected consultant will perform all services associated with the project. The CFPUA may terminate work or pursue other consultant selections at any phase of the project. CFPUA has conducted preliminary evaluations and established a priority list for improvements to various assets at Richardson Water Treatment Plant and well field. The scope of work may include, but not be limited to the following: 1. Chemical Feed Upgrades 2. HVAC Improvements 3. Well field Well house covers 4. SCADA upgrades 5. Manual Transfer Switch for portable generator quick connection upgrade 6. Programmable Logic Controller Incremental Upgrades. 7. Protective floor coatings Other items may be added to this list once identified and prioritized. Overall objectives of this project are outlined below: 1. Gather and evaluate available information provided by CFPUA and perform preliminary field investigations as needed for cost estimation 2. Prepare detailed design and specifications for bidding 3. Obtain all necessary permits and encroachment agreements 4. Provide bidding assistance, certified bid tabulation and letter of recommendation to award 5. Construction administration and observation-based services. Schedule The CFPUA selection team will place strong emphasis on a firm's ability to meet the schedule of deliverables outlined below. The selected consultant will be expected to complete final plans and specification in accordance with the project schedule shown below, or sooner. CFPUA will provide comments on all design submittals generally within 2 weeks from the date received. o Submit SOQ October 5, 2022 o CFPUA Selects Firm(s) October 19, 2022 o Complete Scope and Contract November 3, 2022 o 60% design documents February 17, 2023 o 90% design documents March 17, 2023 o Final contract documents and permits April 17, 2023. Consultant Selection CFPUA will follow a qualifications-based selection process. Consultants must demonstrate their level of competence and qualification, and each sub-consultant's level of competence and qualification, with respect to the listed evaluation factors for the needed services. SOQ's will be evaluated based on the following four (4) considerations and the level of importance for each consideration. The SOQ shall be formatted consistent with the evaluation consideration. Criteria shown under each of the four (4) considerations are to be addressed in the SOQ. Consultant's may provide additional information, as necessary. 1. Project understanding and approach (30%) a. Project understanding b. Approach to manage multiple rehabilitation and upgrade projects c. Description of the design team's quality control program 2. Relevant firm experience (25%) a. Projects of similar size and scope b. References and descriptions of similar projects 3. Overall staff experience proposed for this project (30%) a. Project Manager to lead the design aspect of the project b. Individual team members for each discipline and relevant experience 4. Record of success by the consultant (15%) a. Managing design and construction costs within project budgets and design estimates. Provide 3 previous projects indicating the engineer's opinion of probably cost estimate compared to construction low bid. A more detailed scope of work and fee schedule will be negotiated with the best qualified firm. If negotiations are not successful with any selected firm, CFPUA will terminate negotiations with that firm and initiate negotiations with the next best qualified firm. When a fair and reasonable fee is established, a contract award recommendation will be made to the CFPUA Board for its consideration. Insurance Requirements The following criteria will be deemed necessary for selection: o The firm must meet the following insurance requirements. Workers Compensation may be waived if firm has no employees. o General Liability $1,000,000 per occurrence/$2,000,000 aggregate. Authority must be additional insured and endorsement required. o Workers Compensation $500,000/$500,000/$500,000. Waiver of Subrogation against the Authority and endorsement required. o Auto Liability Insurance $1,000,000 per occurrence combined single limits applicable to claims due to bodily injury and/or property damage. Authority must be additional insured and endorsement required. o Professional Liability not less than $2,000,000 per loss. o Any firm wishing to be considered must be properly registered with the Office of the Secretary of State. Notification The selected firms will be notified by telephone and/or email. The CFPUA reserves the right to reject any and all Proposals.

Conceptual

Water / Sewer

$200,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
54
Bidding Soon
727
All Active Projects
312
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2023

img_map_placeholder

637 Groundwater Way, Wilmington, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.