EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2024 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a bridge / tunnel in Phoenix, Arizona. Design plans call for the construction of a bridge / tunnel.

As of June 3, 2024, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: SECTION I – PROJECT DESCRIPTION The full scope of the Rio Reimagined: 3rd Street Rio Salado Bicycle/Pedestrian Bridge project will consist of constructing a bicycle and pedestrian bridge across the Rio Salado River along the 3rd Street alignment and to improve the southern bank trails of the Rio Salado by adding low-emitting solar pedestrian-scale lighting and pathway amenities in the south side of the Rio Salado River footprint between Central Avenue and 40th Street. This project site is located across the Rio Salado River that aligns with 3rd Street between Central Avenue and 40th Street along the existing pathway on the south side of the Rio Salado River footprint. The estimated total construction cost for this project is $23 million. SECTION II – SCOPE OF WORK To meet the RAISE obligation date of September 30, 2026, the City of Phoenix is pursuing a full design for the Rio Reimagined: 3rd Street Rio Salado Bicycle/Pedestrian Bridge project. The scope of the full design is to develop final design plans, specifications, cost estimates, geotechnical investigations, hydraulic analysis model, and technical reports, coordination with Construction Management at Risk contractor for constructability reviews to produce the contract documents for obligation and construction. Additionally, the scope includes, but is not limited to coordination of tasks with multiple stakeholders including the Federal Highway Administration team, the City Environmental and Right of Way teams for the National Environmental Policy Act “NEPA” clearance, 408 permitting requirements and Right of Way clearance purposes. Questions - Questions pertaining to this selection process or contract issues should be directed to the Contracts Specialist, Annette Perez at (602) 534-1423 or email annette.perez@phoenix.gov. City Rights. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.

Design

Bridges / Tunnels

$23,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
21
Bidding Soon
554
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2027

img_map_placeholder

N 3rd Street Ac, Phoenix, AZ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.